首页> 外国专利> Auger and soil cement synthetic post application modulo null for soil cement synthesis post application

Auger and soil cement synthetic post application modulo null for soil cement synthesis post application

机译:螺旋钻和土壤水泥合成后的应用模零值用于土壤水泥合成后的应用

摘要

PURPOSE:To build up a soil cement column of high quantity by fixing expanded auger movable edges to movable edge support members fixed to an auger support shaft by means of sheat pins during dragging stir and cutting those pins after the end of stir so as to guide the movable edges to retreat. CONSTITUTION:A hardenable filling material is poured from a discharge opening 8 of the forward end of an auger support shaft 1. Simultaneously, an auger head 16 having auger movable edges 3 held in expanded positions is rotated forward through an auger rod 12, and the head 16 is lowered while soil of the ground is forcedly stirred with a filling material to build up a soil cement column having an outside diameter larger than that of a hollow pipe 7. Subse quently, when the hollow pipe 7 gets to a designated depth, the rod 12 is drawn up. Subsequently, after the movable edges 3 are brought into contact with the lower end portion of the hollow pipe 7, shear-pins 6 are cut by the draw-up force of the rod 12 to retreat the movable edges 3. Further, the rod 12 and the head 16 are drawn up through the hollow pipe 7 to be removed.
机译:目的:通过在拖曳搅拌过程中利用护套销将膨胀的螺旋钻活动边缘固定到固定在螺旋钻支撑轴上的活动边缘支撑构件上,从而构建大量的水泥桩,并在搅拌结束后切割这些销以引导可移动边缘后退。组成:可硬化的填充材料从螺旋钻支撑轴1前端的排出口8倒出。同时,将螺旋钻活动边缘3保持在展开位置的螺旋钻头16通过螺旋钻杆12向前旋转,在用填充材料强力搅动地面土壤的同时,降低头部16,以建立外径大于中空管7外径的土壤水泥柱。随后,当中空管7到达指定深度时,杆12被拉起。随后,在使可动边缘3与中空管7的下端部接触之后,通过杆12的拉拔力将剪切销6切断,以使可动边缘3后退。头部16通过中空管7被拉起而被除去。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号