首页> 外国专利> METHOD FOR CONTROLLING INJECTION OF STABILIZER FOR USE IN CONSTRUCTION WORK USING DEEP MIXING PROCESS METHOD

METHOD FOR CONTROLLING INJECTION OF STABILIZER FOR USE IN CONSTRUCTION WORK USING DEEP MIXING PROCESS METHOD

机译:深层混合法控制建筑工程中稳定剂的注入方法

摘要

PROBLEM TO BE SOLVED: To construct an economical and effective ground improved by preventing excessive local supply of a stabilizer while keeping the strength of a ground at a predetermined value or more throughout the length of the ground improved. ;SOLUTION: Original ground data for the area for ground improvement are sampled through preliminary survey, and strength correlation data showing the correlation between the initial strength of a ground and the strength of the improved ground when at least either one of the mixing rate and the amount of injection of a stabilizer is varied for each property of the ground or for each strength of the ground are obtained on the basis of the original ground data obtained. For actual construction work, the stabilizer and soil in the original position are agitated and mixed together while varying least either one of mixing rate and the amount of injection of the stabilizer according to the strength correlation data to match the strength or property of the original ground and the strength needed for each kind of ground is maintained throughout the length of a ground improved P to be constructed.;COPYRIGHT: (C)1999,JPO
机译:解决的问题:通过防止稳定剂的局部过量供应来构建经济有效的地面,同时在整个地面长度上将地面强度保持在预定值或更高。 ;解决方案:通过初步调查对用于改善地面的区域的原始地面数据进行采样,而强度相关数据则显示了当混合速率和混合比中至少有一个时地面的初始强度与改善地面的强度之间的相关性。稳定剂的注入量根据地面的每种特性或针对地面的每种强度而变化,这些都是基于获得的原始地面数据获得的。对于实际施工,将搅拌剂和原始位置的土壤搅拌并混合在一起,同时根据强度相关性数据改变混合速率和稳定剂的注入量中的至少一种以匹配原始地面的强度或性能。并在将要建造的地面改良P的整个过程中保持每种地面所需的强度。;版权所有:(C)1999,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号