首页> 外国专利> The supporting columns of Bo-dama net

The supporting columns of Bo-dama net

机译:博达摩网的支撑柱

摘要

PROBLEM TO BE SOLVED: To solve probelsm that a bearing post for a conventional long ball- prevention net is difficult to carry it in an installation site, at the same time, that the conventional bearing post divided so as to carry it in the site and assembled therein costs much labor for assembly work, takes a long construction period and costs a construction cost, and that joint bolts and nuts are caught in meshes to have the fear of damage in the net. ;SOLUTION: A plurality of steel pipes with different diameters are connected up and down to form a bearing post for ball-prevention net. A flange 5 coming into contact with the upper end face of the lower steep pipe is provided to the lower part 2a (3a) of the upper steel pipe 2 (3) inserted into the lower steel pipe and, at the same time, a plurality of liners (positioning members) coming into contact with the internal circumference of the lower steel pipe is provided to the downward circumference of the flange 5. By the constitution, when the upper steel pipe 2 (3) is inserted into the lower steel pipe, the upper steel pipe 2 (3) is vertically fitted and held on the lower steel pipe.;COPYRIGHT: (C)1998,JPO
机译:解决的问题:为了解决传统的长防球网的轴承座难以在安装现场携带的问题,同时将传统的轴承座分开以在现场安装和搬运,解决了问题。将其组装在其中将花费大量的组装工作劳动力,花费较长的建造时间并花费建造成本,并且将连接的螺栓和螺母卡在网格中以担心会损坏网。 ;解决方案:上下连接多个直径不同的钢管,以形成防球网的支撑柱。在插入下部钢管的上部钢管2(3)的下部2a(3a)上设置有与下部陡管的上端面抵接的凸缘5,并且同时设置有多个。在凸缘5的下圆周上设有与下部钢管的内周抵接的衬套(定位部件)。通过该构成,在将上部钢管2(3)插入下部钢管时,能够将下部钢管的下部与下部钢管的内周抵接。上部钢管2(3)垂直安装并固定在下部钢管上。版权所有:(C)1998,JPO

著录项

  • 公开/公告号JP3145951B2

    专利类型

  • 公开/公告日2001-03-12

    原文格式PDF

  • 申请/专利权人 有限会社富士ベース;

    申请/专利号JP19970119628

  • 发明设计人 藤原 正彦;

    申请日1997-05-09

  • 分类号E04H12/08;A63B69/36;A63B71/02;A63C19/00;

  • 国家 JP

  • 入库时间 2022-08-22 01:35:24

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号