NATURAL GROUND CONSOLIDATION CONSTRUCTION AND TUNNEL EXCAVATION

机译:天然土固结施工及隧道开挖

摘要

PROBLEM TO BE SOLVED: To provide a fitting pipe and a filling construction method, capable of continuous filling work and uniform tunneling work in a short time. ;SOLUTION: A cap 6 is attached onto one end of a filling pipe 3, a filling hole 4 is formed at even intervals in the longitudinal direction, and a bag 5 is formed so as to cover the filling hole 4. The filling hole 4 is formed in the middle of the bag 5. The filling pipe 3 is inserted into a slot 2 punched in a natural ground 1, and a filling material is pressure-fed to the filling pipe 3 to improve the natural ground 1. Preferably, a cement series filling material is used as the filling material, and a tunnel prelining construction method is used as a tunnel excavation method.;COPYRIGHT: (C)2001,JPO
机译:解决的问题:提供一种能够在短时间内连续地进行填充工作并进行均匀的隧道施工的管件和填充施工方法。 ;解决方案:将一个盖子6装在灌装管3的一端,在纵向上等间隔地形成一个灌装孔4,并形成一个袋子5以覆盖该灌装孔4。灌装孔4在袋5的中部形成有塑料袋。将填充管3插入在自然地面1上打孔的槽2中,并且将填充材料压送至填充管道3以改善自然地面1。水泥系列填充料为填充料,隧道预衬施工法为隧道开挖法。;版权所有:(C)2001,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号