首页> 外国专利> SIDEWALK-ROADWAY BLOCK ADJUSTING FITTING, AND BOUNDARY BLOCK CONSTRUCTION METHOD USING THE SAME

SIDEWALK-ROADWAY BLOCK ADJUSTING FITTING, AND BOUNDARY BLOCK CONSTRUCTION METHOD USING THE SAME

机译:侧向滑行道块调整及使用该块的边界块构造方法

摘要

PROBLEM TO BE SOLVED: To provide a sidewalk-roadway boundary block adjusting fitting, which eliminates bothersome manual labor required when sidewalk-roadway boundary block is constructed, facilitates construction of the block, and shortens a construction period, and to provide a boundary block construction method using the fittings. ;SOLUTION: The sidewalk-roadway boundary block adjusting fitting 1 is obtained by crosswise connecting a leg rod 2a equipped with an auxiliary rod 2c for adjusting the height to a receiving rod 2d for supporting a block to form a shelf rod 2, linking a pair of the shelf rods 2 together by a horizontal rod 3a in a manner being spaced a predetermined interval, so that each receiving rod 2d is orthogonal to the horizontal rod 3, and forming male screws 3a at right and left edges of the horizontal rod 3, which are stopped by nuts. To construct the boundary blocks, after crushed stone rolling foundation work, the plurality of sidewalk-roadway boundary block adjusting fittings 1 are arranged at predetermined intervals, and longitudinal front and rear ends of the sidewalk-roadway boundary block are mounted on the adjacent receiving rods 2d of the respective adjusting fittings. Then, concrete forms are erectly assembled at right and left edges of the horizontal rod 3 by using the male screw portions in a manner pinching the receiving rod 2d by lateral edges of the forms, and thereafter concrete is placed so that the entire of the adjusting fittings 1 and part of a lower portion of the sidewalk-roadway boundary block are covered.;COPYRIGHT: (C)2001,JPO
机译:要解决的问题:提供一种人行道-道路边界块调整配件,消除了在建造人行道-道路边界块时所需的繁琐的体力劳动,便于砌块的建造,并缩短了工期,并提供了边界块的构造。使用配件的方法。 ;解决方案:人行道-道路边界块调整配件1是通过将配备有用于调节高度的辅助杆2c的腿杆2a与用于支撑块的支撑杆2d横向连接而形成的,从而将货架杆2链接在一起。架子杆2通过水平杆3a以预定的间隔彼此连接在一起,使得每个接收杆2d与水平杆3正交,并在水平杆3的左右边缘形成外螺纹3a,被坚果挡住了。为了构造边界块,在碎石碾压基础工作之后,以预定间隔布置多个人行道-巷道边界块调节配件1,并且在相邻的接收杆上安装人行道-巷道边界块的纵向前后两端。各个调节配件的2d。然后,通过使用外螺纹部分以通过模板的侧边缘捏住接收杆2d的方式,在水平杆3的左右边缘上竖立地组装混凝土模板,然后放置混凝土,从而整个调节配件1和人行道-道路边界块下部的一部分被覆盖。;版权所有:(C)2001,JPO

著录项

  • 公开/公告号JP2001049613A

    专利类型

  • 公开/公告日2001-02-20

    原文格式PDF

  • 申请/专利权人 BIKEN KOGYO KK;

    申请/专利号JP19990227322

  • 发明设计人 TAKADA TADAYOSHI;

    申请日1999-08-11

  • 分类号E01C11/22;

  • 国家 JP

  • 入库时间 2022-08-22 01:27:59

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号