A method for the central provisioning of underground operating points in civil engineering work operations in the mining

机译:在采矿的土木工程作业中集中提供地下作业点的方法

摘要

In a first operating state, the cold water via the condenser part (19) is fed back in a cooling circuit to the cooling plant (10) and the cold water to be fed to the operating points is conveyed in the cold water circuit via the evaporator part (23). In an alternative operating state, the cold water coming from the cooling plant with the cold machine being switched off is fed via a by-pass (30) connecting the cooling circuit with the cold water circuit directly to the operating points. The cold water is then fed back from the operating points into the cooling circuit. In a further alternative operating state, the cold water coming from the cooling plant is conducted via the evaporator part into the cold water circuit and then to the operating points, from which via the condenser part it is fed to the cooling plant.
机译:在第一运行状态中,经由冷凝器部分(19)的冷水在冷却回路中被反馈到冷却设备(10),并且要被馈送到工作点的冷水经由冷却器在冷水回路中被输送。蒸发器部件(23)。在一种替代的运行状态中,在冷却机关闭的情况下来自冷却设备的冷水通过将冷却回路和冷水回路直接连接到工作点的旁路(30)输送。然后将冷水从工作点反馈到冷却回路中。在另一种替代的运行状态中,来自冷却设备的冷水通过蒸发器部分导入冷水回路中,然后到达工作点,再通过冷凝器部分将其从冷凝器部分输送到冷却设备中。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号