PROCEDURES FOR THE SUCCESSFUL MANUFACTURING AND AUDITING OF THE CONCLUSION SIDE OF THE HOUSE CONCLUSION FOR A CONCLUSION WITH A TRACK AND TRACK CHANNEL BETWEEN A RAILWAY AND A WARM TRANSFER CHANNEL
PROCEDURES FOR THE SUCCESSFUL MANUFACTURING AND AUDITING OF THE CONCLUSION SIDE OF THE HOUSE CONCLUSION FOR A CONCLUSION WITH A TRACK AND TRACK CHANNEL BETWEEN A RAILWAY AND A WARM TRANSFER CHANNEL
The inner pipe (10) or stub is installed, mounted and later inspected directly from the side of the house service connection of the heat consumer at a larger distance of more than 35 m from the next branch. Said works need only be carried out when all welding works at the stub (1) have been completed and the stub is already buried in the ground. Only a few minutes are required for installing and mounting. The advantages of the process are immediately recognisable in the working procedure, production costs and subsequent inspection of the stub.