Prior simulation results and model changes are used to shorten re-simulation time in improved design verification methodology, wherein simulator is re-run on design revision. Accelerated incremental simulation scheme boosts engineer design and verification productivity, and facilitates storage of different design revisions and simulation results.
展开▼