TEMPORARY ESTABLISHMENT STRUCTURE FOR CROSSING OF RAIL FOR MEMBER TRANSPORT

机译:会员过境铁路过境的临时设施

摘要

The present invention relates to the construction of a railroad cross-section temporary facility for transporting construction materials using a transmission device. More specifically, a steel rail is installed to traverse a construction material onto an existing railroad, and a monorail and an electric hoist are installed on the steel pillar. The present invention relates to a railroad cross-facility structure for transporting construction materials using a transmission device installed to be used for railroad construction by transporting materials or members used in construction work on railroads.;The present invention, in the structure that is installed across the track used to move the construction material, across the top of the railroad A and railroad B so that the transmission device to move the construction material without any disruption to the operation of the train On the railroad A and railroad B, a base concrete part is placed on one side, and steel pillars are respectively installed on an upper side of the base concrete part, and a square is attached to the bottom of the railroad cross-facility structure that can be used. A fixed anchor is coupled to the flange and seated on the upper part of the foundation concrete part. The steel beam is installed so that the anchor beam supports the steel beam horizontally about a vertical middle part, and the steel pillar is provided with an upper finishing corner at the top. In the upper finishing slag, a monorail beam is installed to cross the middle portion in the width direction and The monorail beam of the power transmission hoist is installed at the bottom to move the construction material up and down, and the anchor beam supporting the steel pole at the top of the rail so that the support beam at the top of the railway A and railway B so as not to disturb the operation of the train It is installed to cross the upper part and the sleeper and the rail is installed on the supporting beam to form a rail, while the rail is mounted on the upper part of the rail, A and B of the material movement loading plate driven by moving wheels. It provides a rail transverse cross-facility structure for transporting construction materials using a transmission device, characterized in that the structure to move the construction material to the left, right by operating from the top.
机译:铁路横截面临时设施的建造技术领域本发明涉及一种铁路横截面临时设施的建造,该设施用于使用传输装置来运输建筑材料。更具体地,安装钢轨以将建筑材料横穿到现有的铁路上,并且在钢柱上安装单轨和电动葫芦。铁路交叉设施结构技术领域本发明涉及一种铁路交叉设施结构,该铁路交叉设施结构使用通过安装在铁路建设中使用的传输装置来传输建筑材料,该传输装置用于传输在铁路上进行的建筑工作中使用的材料或构件。用于在铁路A和铁路B的顶部上移动建筑材料的轨道,从而使传输装置在不中断火车运行的情况下移动建筑材料。在铁路A和铁路B上,基础混凝土部分在一侧上放置钢柱,并在基础混凝土部分的上侧分别安装钢柱,并在可使用的铁路交叉设施结构的底部连接一个正方形。固定锚连接到法兰,并位于基础混凝土部分的上部。安装钢梁以使锚定梁围绕垂直的中间部分水平地支撑钢梁,并且钢柱在顶部具有上修整角。在上部精炼炉渣中,在宽度方向的中央部设置有单轨横梁,在下部设置有动力传递葫芦的单轨横梁,以使建筑材料上下移动,支撑钢的锚定梁横杆位于铁轨的顶部,以使铁轨A和铁轨B的顶部的支撑梁不会干扰火车的运行。横梁的上部与轨枕交叉安装,横梁被安装在支撑梁形成轨道,同时将轨道安装在轨道的上部,由移动轮驱动的物料移动加载板的A和B。它提供了一种用于使用传输装置来运输建筑材料的铁路横向交叉设施,其特征在于,该结构通过从顶部进行操作而使建筑材料向左,向右移动。

著录项

  • 公开/公告号KR200286540Y1

    专利类型

  • 公开/公告日2002-08-21

    原文格式PDF

  • 申请/专利权人 주식회사 한구엔지니어링;

    申请/专利号KR20020015126U

  • 发明设计人 윤석기;

    申请日2002-05-17

  • 分类号B66C7/08;

  • 国家 KR

  • 入库时间 2022-08-22 00:28:35

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号