摘要

FIELD: hydraulic engineering, in particular, construction of diversion small hydroelectric stations on mountain rivers. SUBSTANCE: the building of the hydroelectric station has a light upper structure, feeding and discharge flow channels of the horizontal hydroelectric unit with a straight-axis draught tube, the discharge chamber and the foundation plate under the hydroelectric unit make up a rigid spatial construction serving as a deepened foundation of the hydroelectric unit. The discharge chamber represents a built-up reinforced-concrete prefabricated construction consisting of several separate members mounted and monolithic finished on the workplace. Conjugation of the discharge chamber outlet and the discharge channel is made by a reinforced- concrete pipe of square section assembled of two or more separate standard prefabricated members. The conjugating pipe is equipped at the outlet with a bottom wall providing the necessary sinking of the discharge pipe outlet section, and standard built-up reinforced-concrete lean-to members for conjugation with the slopes of the discharge channel. The upper lightened structure represents a built-up construction: of a separate strip foundation that is not coupled to the foundation of the hydroelectric unit, and a metal framework mounted on it, wall panels of section plate material with a warmth-keeping jacket mounted on the metal framework, and slabs with an assembly hatch and a detachable hatch door. The method for erection consists in examination of the hydrology of rivers, conducting of geological and geodetic surveyings of river range lines, construction of the headwork and diversion canals, first selected are one, two or more standard sizes of hydraulic turbines of different power, consumption ranges and operating heads. After that differential selection of the river range lines is accomplished in accordance with the parameters of the selected standard sizes of hydraulic turbines. All the river range lines are divided into groups. At construction of the hydraulic electric station the rated head is provided by selection of the lengths of the diversion canals. The main and auxiliary equipment is built up and unified by groups. Modular hydroelectric unit and electric block-sections assembled of unified constructions unified by these groups are developed. After fabrication of the unified constructions and transportation of the hydroelectric unit block-sections and their mounting are accomplished, after that arrangement of the building of the hydroelectric station consisting of 1,2 and more hydroelectric units and the respective number of electrical block-sections is accomplished. EFFECT: reduced material costs for designing and construction of hydroelectric stations and the term of putting the stations into operation. 2 cl, 2 dwg
机译:领域:水利工程,特别是在山区河流上分流小型水力发电站的建设。实质:水电站的建筑物上部结构较轻,卧式水电机组的进出水流道带有直轴引流管,水电站下方的出水室和底板构成了刚性的空间结构作为水力发电机组的加深基础。卸料室是一个由钢筋混凝土预制而成的预制结构,由几个分开的构件组成,并在工作场所整体式完成。排放室出口和排放通道的接合是通过由两个或多个单独的标准预制构件组装而成的方形截面的钢筋混凝土管完成的。接合管在出口处配备有底壁,以提供排放管出口部分的必要沉没,并配有标准的钢筋混凝土倾斜构件,以与排放通道的斜面接合。上部的轻型结构代表了建筑结构:一个单独的带状基础(未与水力发电单元的基础耦合),金属框架安装在其上,型材的墙板安装了保温套金属框架,以及带有装配舱口和可拆卸舱口门的平板。架设方法包括检查河流水文,进行河流测距线的地质和大地测量,建造顶渠和引水渠,首先选择一台,两台或更多台不同功率,消耗量的水力涡轮机范围和操作头。之后,根据选定的水力涡轮机标准尺寸的参数完成对河道线的差异选择。所有河流范围线都分为几组。在建设水力发电站时,通过选择引水渠的长度来提供额定水头。主要和辅助设备是按组建立和统一的。开发了由这些组统一构造的模块化水力发电机组和电气块截面。在制造出统一的结构后,完成了水力发电单元的截面积的运输及其安装,之后,对水电站的建筑物进行了布置,该建筑物由1,2个及更多的水力发电单元组成,相应的电气截面积为完成。效果:减少了水电站设计和建造的材料成本以及使水电站投入运行的期限。 2 cl,2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号