FIELD: oil industry. SUBSTANCE: proposed method comes to mounting jet pump and packer on tubing string, running in of tubing string, packer releasing and building required depression in under-packer zone by pumping liquid out of under-packer zone. Tubing string, valve unit with seat for mounting check valve, liner with inlet funnel and circulation valve. Assembling is done by mounting, in turn, the following parts on tubing string: pump, disconnecting/connecting unit, valve unit, packer and liner. When running in, packer is installed at distance not less than 50 m higher than top of producing formation, and inlet funnel, not higher than 2 m from top of said formation. After releasing of packer, gun with sealing unit is lowered into well on logging cable which gets onto seat in pump passage channel. Gun is arranged opposite to producing formation. Pump is used to build required differential pressure, gun is blasted and drainage of formation is carried out until liquid under packer is completely replaced by formation fluid. Then gun with sealing unit is withdrawn and radiator and physical fields receiver-converter with sealing unit are lowered into well and, with pump operating, evaluation of formation in zone of perforation and testing of formation fluid getting into well are carried out. Then radiator and receiver-converter are withdrawn, and valve insert and locking insert are lowered into well to isolate inner space of tubing string and surrounding space. By delivering alleviated medium into space surrounding tubing string and squeezing the medium into space of tubing string, well is set for flowing operation. After decrease of well production rate, well is killed through circulation valve by higher density liquid with closing of check valve, locking insert is taken out and depression insert with self-contained pressure gauge and flowmeter is lowered into tubing string and formatting fluid is pumped out of well at different pressures simultaneously measuring well production rate on the surface and under jet pump. Then depression insert with pressure gauge and flowmeter is taken out, readings of bottom-hole pressures and production rates are taken and curve is plotted defining dependence of flow rate from bottom-hole pressure, and type-size of pump required for forced production of oil is determined using the plotted curve. Then jet pump with above-set tubing string is disconnected by means of disconnecting/connecting unit and is lifted to surface. Pump of required capacity for production of oil is lowered on tubing string into well and is connected with part of tubing string left in well after which well is started for forced production. EFFECT: optimization of dimensions of design members, improved reliability of well jet plant in operation. 3 cl, 8 dwg
机译:领域:石油工业。实质:建议的方法是将喷射泵和封隔器安装在油管柱上,进入油管柱,封隔器释放并通过将液体从封隔器下层泵出而在封隔器下区域建立所需的凹陷。油管柱,带用于安装止回阀的阀座的阀单元,带进气漏斗的衬套和循环阀。通过依次在油管柱上安装以下零件来完成组装:泵,断开/连接单元,阀单元,封隔器和衬管。驶入时,封隔器的安装距离生产地层顶部的高度应不小于50 m,进口漏斗的安装高度应距该地层顶部的高度不超过2 m。松开封隔器后,将带有密封装置的喷枪放到测井电缆上的井中,该电缆进入泵通道中的阀座。喷枪与采油层相对布置。使用泵建立所需的压差,对喷枪进行喷砂处理,然后进行地层排空,直到封隔器下方的液体完全被地层流体替代。然后抽出带有密封装置的喷枪,将带有密封装置的辐射器和物理场接收器-转换器降到井中,并在泵工作的情况下,对射孔区域的地层进行评估并测试进入地层的流体。然后抽出散热器和接收器转换器,将阀芯和锁定芯降低到井中,以隔离油管柱的内部空间和周围空间。通过将缓解的介质输送到油管柱周围的空间并将介质压缩到油管柱的空间中,井可以进行流动操作。降低井产量后,在单向阀关闭的情况下,井将通过高密度液体通过循环阀杀死,取出锁紧插件,将带有独立压力计和流量计的低压插件降低到管柱中,并抽出格式化液在不同压力下的油井同时测量地表和射流泵下的油井生产率。然后取出带有压力表和流量计的低压插入件,读取井底压力和生产率的读数,并绘制曲线以定义流速与井底压力的关系,以及强制采油所需的泵的型号使用绘制的曲线确定。然后,通过断开/连接单元断开具有上述管柱的喷射泵,并将其提升到地面。将所需产能的泵从油管柱上降低到井中,并与留在油井中的一部分油管柱连接,然后启动油井进行强制生产。效果:优化设计构件的尺寸,提高井喷装置运行的可靠性。 3厘升,8载重吨

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号