首页> 外国专利> Construction work rolling pressure management method

Construction work rolling pressure management method

机译:施工工程滚动压力管理方法

摘要

PROBLEM TO BE SOLVED: To provide a land formation work rolling control system and a land formation work rolling control method capable of controlling the number of three dimensional rollings including the height in a rolling area even in the sloped filling ground.;SOLUTION: The rolling area 4 is divided into three dimensional block areas D based on a processing result of GPS position measuring data, at the same time, a moving locus of a rolling machine calculates the number of times passing through the three dimensional block areas D, and the number of times is used as the number of rolling times to carry out rolling work by the rolling machine. By the constitution, a rolling state (the number of rolling times) of the rolling machine in the three dimensional block areas D is three dimensionally grasped, and three dimensional rolling times can be controlled even in the sloped filling ground.;COPYRIGHT: (C)2002,JPO
机译:要解决的问题:提供一种土地成形工作滚动控制系统和一种土地成形工作滚动控制方法,该系统和方法能够控制三维轧制次数,包括即使在倾斜的填土场中轧制区域的高度。区域4基于GPS位置测量数据的处理结果而被划分为三维块区域D,同时,轧制机的移动轨迹计算通过三维块区域D的次数以及该次数。次数被用作通过轧制机进行轧制工作的轧制次数。通过该构造,三维地掌握了在三维块区域D中的轧制机的轧制状态(轧制次数),并且即使在倾斜的填充地面中,也可以控制三维轧制时间。日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号