首页> 外国专利> Method and apparatus for placing and cementing casing in horizontal wells

Method and apparatus for placing and cementing casing in horizontal wells

机译:在水平井中放置和固井套管的方法和设备

摘要

An apparatus (10) for placing and cementing a casing string (12) in a horizontal well bore section (14) comprises a float shoe (18) attached to the end of the casing string (12) and a float collar (22) connected in the casing string (12) for trapping air (25) in a first portion (24) of the casing string (12) thereby causing it to be buoyed up during placement by drilling fluid (16) contained in the well bore. A selectively openable and releasable closed baffle assembly (34) is connected within the casing string (12) for trapping air (25) or a low density fluid (38) in a second portion (36) of the casing string (12) thereby causing it to also be buoyed up by drilling fluid (16) in the well bore. The buoying up of the casing string reduces placement drag and consequent compressive loading on the casing string (12). A method of the invention comprises placing the apparatus (10) in a horizontal well bore section (14), opening the closed baffle means (34) to allow fluid circulation and conditioning of the annulus (13), landing a bottom cementing plug on the baffle assembly (90), releasing the baffle assembly (90) and moving it to the float collar (22). A cement slurry is thereafter placed in the annulus and allowed to set therein. IMAGE
机译:一种用于将套管柱(12)放置并固结在水平井眼部分(14)中的装置(10),其包括附接到套管柱(12)的端部的浮靴(18)和连接的浮箍(22)。套管柱(12)中的气体用于在套管柱(12)的第一部分(24)中捕集空气(25),从而在放置期间通过钻井孔中包含的流体(16)使空气浮起。选择性可打开和可释放的闭合挡板组件(34)连接在套管柱(12)内,用于将空气(25)或低密度流体(38)捕获在套管柱(12)的第二部分(36)中,从而引起还可以通过在井眼中钻井液(16)来支撑它。套管柱的浮起减小了布置阻力并因此减小了套管柱(12)上的压缩载荷。本发明的方法包括将设备(10)放置在水平井筒部分(14)中,打开闭合的挡板装置(34)以允许流体循环和调节环带(13),将底部固井塞降落在井眼上。挡板组件(90),松开挡板组件(90)并将其移至浮动套环(22)。然后将水泥浆放置在环带中并使其凝固。 <图像>

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号