首页> 外国专利> SOIL-IMPROVEMENT METHOD AND SOIL-IMPROVEMENT DEVICE IN TUNNEL CONSTRUCTION WORK

SOIL-IMPROVEMENT METHOD AND SOIL-IMPROVEMENT DEVICE IN TUNNEL CONSTRUCTION WORK

机译:隧道施工中的土壤改良方法及土壤改良装置

摘要

PROBLEM TO BE SOLVED: To provide a soil-improvement method and a soil-improvement device in tunnel construction works, which can be adopted regardless of the type of the cutter structure of a tunnel boring machine and in which chemicals can be injected properly even on the inside of a curve in the case of the construction of a sharp curve and a wide working space can be ensured.;SOLUTION: An injection pipe 50 is extended up to the tunnel boring machine 1 side obliquely forwards from an existing segment 14a placed at the rear of the tunnel boring machine 1, and a soil-improvement agent (chemicals) is injected from the injection pipe 50. Accordingly, chemicals are injected regardless of the cutter structure of the boring machine 1 completely. Since an angle of inclination θ to a tunnel center line of the pipe 50 is increased easily, chemicals can be injected properly even inside a curve by increasing the angle in the rectangular direction in the case of the construction of the sharp curve. Since a section where the segment 14a is positioned is separated from the boring machine 1, the wide working space can be ensured.;COPYRIGHT: (C)2004,JPO
机译:要解决的问题:提供一种在隧道施工中的土壤改良方法和土壤改良装置,无论隧道掘进机的刀具结构类型如何,都可以采用该土壤改良方法和土壤改良装置,并且即使在地面上也可以适当地注入化学药品解决方案:解决方案:将注水管50从放置在此处的现有管段14a倾斜地向前延伸至隧道掘进机1侧。在隧道掘进机1的后部,从注入管50注入土壤改良剂(化学剂)。因此,无论掘进机1的切割器结构如何,都注入化学剂。由于倾斜角度θ在形成弯曲的情况下,通过增大沿管50的隧道中心线的角度,即使在弯道内也可以通过在矩形方向上增大角度来适当地注入化学药品。由于段14a的定位部分与镗床1分开,因此可以确保宽的工作空间。版权所有:(C)2004,JPO

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号