首页>
外国专利>
SOIL-IMPROVEMENT METHOD AND SOIL-IMPROVEMENT DEVICE IN TUNNEL CONSTRUCTION WORK
SOIL-IMPROVEMENT METHOD AND SOIL-IMPROVEMENT DEVICE IN TUNNEL CONSTRUCTION WORK
展开▼
机译:隧道施工中的土壤改良方法及土壤改良装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a soil-improvement method and a soil-improvement device in tunnel construction works, which can be adopted regardless of the type of the cutter structure of a tunnel boring machine and in which chemicals can be injected properly even on the inside of a curve in the case of the construction of a sharp curve and a wide working space can be ensured.;SOLUTION: An injection pipe 50 is extended up to the tunnel boring machine 1 side obliquely forwards from an existing segment 14a placed at the rear of the tunnel boring machine 1, and a soil-improvement agent (chemicals) is injected from the injection pipe 50. Accordingly, chemicals are injected regardless of the cutter structure of the boring machine 1 completely. Since an angle of inclination θ to a tunnel center line of the pipe 50 is increased easily, chemicals can be injected properly even inside a curve by increasing the angle in the rectangular direction in the case of the construction of the sharp curve. Since a section where the segment 14a is positioned is separated from the boring machine 1, the wide working space can be ensured.;COPYRIGHT: (C)2004,JPO
展开▼