首页> 外国专利> Landing bridge null for tunnel construction

Landing bridge null for tunnel construction

机译:隧道施工的登机桥无效

摘要

PROBLEM TO BE SOLVED: To improve work environment and work efficiency. SOLUTION: In a landing bridge for tunnel construction work which allows a vehicle for carrying out earth and sand to pass and ensures a work space 24 for placing concrete in a digged tunnel lower part 20, a crawler 14 moving a base 10 in the forward, backward, right, and left directions is mounted on a front, rear, and lower part of the base 10, a dust collection machine 16 is mounted in an upper part of the base 10, a form 18 for placing concrete is suspended in a lower part of the base 10 so as to lift and lower freely or a scraper 32 leveling an upper face of banking provided on a surface on which concrete is placed is mounted, and concrete 22 is placed in the tunnel lower part 20 digged through the form 18 for placing concrete.
机译:要解决的问题:改善工作环境和工作效率。解决方案:在用于隧道施工的层架桥中,履带车辆14向前移动,履带14使基座10向前移动,而该履带架允许进行泥土和沙土的车辆通过,并确保将工作空间24放置在挖出的隧道下部20中。向后,左右方向分别安装在基座10的前,后和下部,集尘机16安装在基座10的上部,用于放置混凝土的模板18悬挂在下部安装基座10的一部分以自由升降,或者安装刮板32以使设置在放置混凝土的表面上的堤岸的上表面水平,并且将混凝土22放置在通过模板18挖出的隧道下部20中用于放置混凝土。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号