State-of-the-Art Technology in the Construction of Sea-Crossing Fixed Links with a Bridge, Island, and Tunnel Combination

机译:跨海桥梁,海岛和隧道结合的固定式连接施工中的最新技术

获取原文
获取原文并翻译 | 示例
       

摘要

In general, two kinds of structures are used to provide a way across a river, canal, sea, or other obstacle: bridge structures that pass over the obstacle, and tunnel structures that pass below the obstacle. Although the construction of both bridges and tunnels can be traced back over thousands of years, bridge–tunnel combinations that use an island as a sea-crossing fixed link (SCFL) have only been built over the past 82 years. The first such combination was probably the 6.4 km long San Francisco–Oakland Bay Bridge in the United States, which was completed in 1936. The most recently constructed SCFL combining a bridge, tunnel, and island is the Hong Kong–Zhuhai–Macau (HZM) Bridge, which opened for traffic on October 24, 2018 with the longest SCFL combination in the world, at a total length of 29.6 km.
机译:通常,使用两种结构来提供一条穿过河流,运河,海洋或其他障碍物的道路:穿过障碍物的桥梁结构和穿过障碍物下方的隧道结构。尽管桥梁和隧道的建设都可以追溯到数千年前,但是使用岛作为跨海固定链接(SCFL)的桥隧组合仅在过去82年中才建成。第一个这样的组合可能是美国长6.4公里的旧金山–奥克兰湾大桥,于1936年完工。最新建造的SCFL结合了桥梁,隧道和岛屿,是香港–珠海–澳门(HZM )大桥于2018年10月24日通车,是世界上最长的SCFL组合,全长29.6公里。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号