首页> 外国专利> A BACKTRACKING RESOURCES PLANNING ALGORITHM

A BACKTRACKING RESOURCES PLANNING ALGORITHM

机译:回溯资源规划算法

摘要

A method of scheduling a plurality of tasks includes the steps of establishing a node representative of each task, and indicative of resources required to perform that task. A hierarchy is established between the nodes to indicate an order in which tasks represented by the node are to be performed. The nodes whose hierarchy permits tasks represented by the node to be performed are selected to a next nodes list. A source is assigned to each of the selected nodes and is indicative of a priority to be accorded to respective ones of the selected nodes. The node with the highest priority is scheduled.
机译:一种调度多个任务的方法,包括以下步骤:建立代表每个任务的节点,并指示执行该任务所需的资源。在节点之间建立层次结构,以指示执行该节点代表的任务的顺序。将其层次结构允许执行由该节点代表的任务的节点选择到下一个节点列表。源被分配给每个所选节点,并指示与所选节点中的各个相应的优先级。优先级最高的节点已调度。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号