首页> 外国专利> ROCK BOLT CONSTRUCTION METHOD, AND CONSTRUCTION METHOD USING DEVICE FOR MEASURING LENGTH OF EXCAVATED HOLE AFTER COMPLETION OF EXECUTION OF WORK AND MATERIAL FOR THE DEVICE

ROCK BOLT CONSTRUCTION METHOD, AND CONSTRUCTION METHOD USING DEVICE FOR MEASURING LENGTH OF EXCAVATED HOLE AFTER COMPLETION OF EXECUTION OF WORK AND MATERIAL FOR THE DEVICE

机译:岩石螺栓施工方法及使用该设备的施工方法及完工后的材料测量方法

摘要

PROBLEM TO BE SOLVED: To provide a rock bolt construction method which enables the measurement of length of an excavated hole inside a pit after the completion of execution of work, and a material.;SOLUTION: The material is composed of a pipe A for a deep part, wherein a spacer 5 is formed, a pipe B for extension, and a coupling material C. After the material is assembled and inserted into a hollow part of a rock bolt, a grout material is injected from the hollow part of the rock bolt so that the rock bolt and the inside of an excavated hole pit can be filled with the grout material, and fixing and anchorage are applied. Even in this case, the grout material is prevented from intruding into a hollow part 4 of the material, and only the removal of a lid D in inspection enables a piano wire with predetermined dimensions to be inserted thereinto for the measurement of the length of the excavated hole.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:解决的问题:提供一种岩栓的施工方法,该方法能够在完成工作后测量坑内开挖的孔的长度和材料。;解决方案:该材料由用于施工的管道A组成。较深的部分,其中形成有垫片5,用于延伸的管道B和耦合材料C。将材料组装并插入到岩石锚杆的中空部分后,从岩石的中空部分注入浆状材料以便使锚固螺栓和挖掘孔坑的内部充满灌浆材料,并进行固定和锚固。即使在这种情况下,也可以防止灌浆材料侵入材料的中空部分4,并且仅在检查时取下盖子D,才可以将具有预定尺寸的钢琴线插入其中,以测量琴弦的长度。挖洞;版权所有:(C)2005,日本特许厅

著录项

  • 公开/公告号JP2004332502A

    专利类型

  • 公开/公告日2004-11-25

    原文格式PDF

  • 申请/专利权人 KISHIMOTO TADAO;

    申请/专利号JP20030160107

  • 发明设计人 KISHIMOTO TADAO;

    申请日2003-04-30

  • 分类号E21D20/00;

  • 国家 JP

  • 入库时间 2022-08-21 22:32:46