首页> 外国专利> STRUCTURE AND METHOD FOR JOINING STEEL PIPE PILE AND UPPER STRUCTURE

STRUCTURE AND METHOD FOR JOINING STEEL PIPE PILE AND UPPER STRUCTURE

机译:连接钢管桩和上部结构的结构和方法

摘要

PROBLEM TO BE SOLVED: To provide a structure and a method for joining a steel pipe pile and an upper structure, which enable cost reduction and the shortening of a construction period by simply and surely installing a transferred stress reducing device.;SOLUTION: In the structure for joining the steel pipe pile and the upper structure, the transferred stress reducing device 4 for reducing the transfer of stress is interposed between the steel pipe pile 1 and the upper structure 3 which is formed above the steel pipe pile 1; a filling concrete part 6 is formed in a pile head part 2 of the steel pipe pile 1; a first anchor material 7, which protrudes upward from inside the filling concrete part 6, is protrusively provided on an upper end surface of the filling concrete part 6; and the device 4 is fixed to the first anchor material 7, and fixed to the upper structure 3 by a second anchor material 15 which is fixed to the device 4.;COPYRIGHT: (C)2005,JPO&NCIPI
机译:要解决的问题:提供一种用于连接钢管桩和上部结构的结构和方法,该结构和方法可以通过简单,可靠地安装传递应力的减小装置来降低成本并缩短工期。在用于将钢管桩与上部结构接合的结构中,在钢管桩1与形成于钢管桩1的上方的上部结构3之间插入有用于降低应力传递的传递应力降低装置4。在钢管桩1的桩头部2形成有填充混凝土部6。从填充混凝土部6的内部向上突出的第一锚固材料7突出地设置在填充混凝土部6的上端面上。装置4固定在第一锚固材料7上,并通过固定在装置4上的第二锚固材料15固定在上部结构3上。版权所有:(C)2005,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号