首页>
外国专利>
METHOD FOR MANAGING FEASIBILITY OF POWER PLANT FIELD BASED ON BASIC DATA INPUTTED FROM USER
METHOD FOR MANAGING FEASIBILITY OF POWER PLANT FIELD BASED ON BASIC DATA INPUTTED FROM USER
展开▼
机译:基于用户输入的基础数据的电厂可行性管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A method for managing feasibility of a power plant field based on basic data inputted from a user is provided to offer a cash flow result window or a standard report by extracting data from a loan refundment plan and an estimated profit/loss statement, after fixing the loan refundment plan and making the estimated profit/loss statement based on the data inputted from the user. CONSTITUTION: The user inputs the basic data(S20). Based on the basic data, the loan refundment plan divided into sectors for calculating the load refundment plan and determining a loan input ratio during a construction term is fixed, and the estimated profit/loss statement is made(S22). The cash flow result window is output by extracting the data from the loan refundment plan and the estimated profit/loss statement, and the report attaching the extracted data is output by loading a report form if a report output command is received(S23).
展开▼