SEGMENT ASSEMBLING WORK METHOD FOR SHIELD TUNNELING METHOD AND SEGMENT FEEDER

机译:盾构隧道法的分段装配工作方法及分段给料器

摘要

PROBLEM TO BE SOLVED: To facilitate rail advancing work when a set of segment feeding equipment such as a transfer conveyor, a rail and a hoist is transferred forward along with the excavation of a shield machine.;SOLUTION: The transfer conveyor 70 is arranged in the rear of an erector 20 of the shield machine 10; a plurality of brackets, which are provided with a pair of rollers, are detachably suspended on a top surface in an existing tunnel from above the vicinity of the transfer conveyor 70 to the rear of it; the rails 80, from which the hoist 90 is travelably suspended between the pair of rollers, are temporarily fixed by being sequentially laid in such a manner as to be freely transferred forward; after a segment 40 is assembled by using a truck 50, the shield machine 10 is made to perform the excavation and the transfer conveyor 70 is advanced; the rail 80, which is unfixed by transferring the rear bracket 84 forward, is transferred forward to be refixed; and the above steps are repeated so that the segments 40 can be sequentially fed for assembly.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:解决的问题:当将一组分段进给设备(例如转移输送机,轨道和葫芦)与盾构机的挖掘一起向前转移时,为了便于轨道推进工作;解决方案:转移输送机70布置在屏蔽机10的竖立机20的后部;从转移输送机70附近的上方到其后方,在已有的隧道的上表面可装卸地悬挂有设置有一对辊的多个托架。升降机90可移动地悬挂在其上的轨道80在一对辊之间通过顺序放置而临时固定,从而可以自由向前移动。在使用卡车50组装了节段40之后,使遮蔽机10进行挖掘并且使传送输送机70前进。通过向前移动后支架84而未固定的轨道80被向前移动以重新固定。并重复上述步骤,以便可以依次送入节段40进行组装。;版权所有:(C)2006,日本特许厅&日本特许厅

著录项

  • 公开/公告号JP2006009343A

    专利类型

  • 公开/公告日2006-01-12

    原文格式PDF

  • 申请/专利权人 KYOWA SEISAKUSHO:KK;

    申请/专利号JP20040186228

  • 发明设计人 NISHI MASAMI;

    申请日2004-06-24

  • 分类号E21D11/40;

  • 国家 JP

  • 入库时间 2022-08-21 21:56:31