首页>
外国专利>
Four installation components which the husband Various are adhered by the top of the main pillar material of the four side which forms
Four installation components which the husband Various are adhered by the top of the main pillar material of the four side which forms
展开▼
机译:在形成的四个侧面的主支柱材料的顶部粘接有丈夫各种的四个安装零件
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a derrick device to perform a high-efficient and smooth replacement work for the cross arm of a transmission steel tower. ;SOLUTION: By using a derrick device 1 of the top part of a steel tower 31, cross arms 32a are replaced on one side and another. An existing cross arm member cut and removed at an intermediate part is lifted down by a derrick device 1 and a newly arranging cross arm member is lifted up to effect a work. The derrick device 1 is assembled on a support frame 3. A mounting member 2 is fixed at the upper end part of a main column material 34 of the steel tower 31, the support frame 3 is caused to span and a main column material 34 is coupled thereto and the upper end part of the steel tower 31 is reinforced. A boom 4 is pivotally supported at the central part of a frame material. A lifting wire 10 is operated by a winch on a ground and a material is suspended by a boom 4. A pair of front legs 5 are pivotally supported at the two end parts of the frame material, and a pair of rear legs 6 are pivotally supported at the two end parts of the frame material. The upper ends of the front legs 5 and the rear legs 6 are pivotally supported at a coupling member. A wire 9 for regulating rise and fall of the boom 4 is locked to a winch for rise and fall on a ground.;COPYRIGHT: (C)1998,JPO
展开▼