首页> 外国专利> It has with the 2nd concatenated component which the 1st concatenated component and the main pillar material the main pillar material of the upper part side which

It has with the 2nd concatenated component which the 1st concatenated component and the main pillar material the main pillar material of the upper part side which

机译:第一级联部件和主支柱材料具有第二级联部件,上部侧的主支柱材料具有第二级联部件和主支柱材料。

摘要

PROBLEM TO BE SOLVED: To perform safe work, while securing safety of a steel tower to be cut and separated, while restraining removal work by a suspending device such as a crane and a helicopter to minimum operation.;SOLUTION: This temporary connecting tool has a first connecting member R1 connected to an upper side main column material A1a to be separated, and a second connecting member R2 connected to a lower side main column material A1b to be left, when disassembling a tower structure A. In the first connecting member R1 and the second connecting member R2, the upper side tower structure A (the main column material A1a) is separated and moved by the suspending device KH such as the crane and the helicopter, after cutting a main column material A1 of this position from between the first connecting member R1 and the second connecting member R2 of a temporary connecting state, by using a temporary connecting tool 1 having mutually fitting fitting parts 5 and 7.;COPYRIGHT: (C)2007,JPO&INPIT
机译:解决的问题:要执行安全工作,同时要确保要切割和分离的钢塔的安全,同时要限制起重机和直升机等悬挂装置的拆卸工作,以尽量减少操作。解决方案:此临时连接工具具有当拆卸塔架结构A时,第一连接构件R1连接到上侧主柱材料A1a以分离,第二连接构件R2连接到下侧主柱材料A1b。在第二连接构件R2和第二连接构件R2中,从起重机之间切断该位置的主柱材A1之后,利用起重机,直升飞机等悬挂装置KH使上侧塔结构A(主柱材A1a)分离移动。通过使用具有相互配合的装配部件5和7的临时连接工具1,将临时连接状态的第一连接部件R1和第二连接部件R2设置为临时连接状态。 INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号