首页>
外国专利>
Being the shuttle bus operation management
Being the shuttle bus operation management
展开▼
机译:担任穿梭巴士运营管理
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a shuttle bus operation control system offering convenience to passengers who get on a shuttle bus by changing the departure time of the shuttle bus according to the fluctuating time when the arrival time of a train arriving at a station fluctuates in the operation of the shuttle bus departing from the station of an electric railroad transportation means.;SOLUTION: A PC 14 is composed of a fixed time discriminating means 15 for discriminating whether or not the train arrival time at the station acquired by a train arrival time acquiring means is later than the predetermined train arrival time; a time delay calculating means 16 for calculating a time delay from the fixed time when the train arrival time exceeds the fixed time; a bus departure time calculating means 21 for calculating the bus change departure time based on the calculated result of the time delay calculating means 16; and a CPU 17 taking charge of these control.;COPYRIGHT: (C)2004,JPO
展开▼