首页> 外国专利> Rolling method pig PIPE large and medium-diameter ingots and billets titanium-based alloy on pipe-rolling installation with pilger

Rolling method pig PIPE large and medium-diameter ingots and billets titanium-based alloy on pipe-rolling installation with pilger

机译:用皮尔格轧制法轧制生猪PIPE大中直径铸锭和坯料钛基合金

摘要

1.method of rolling u043fu0435u0440u0435u0434u0435u043bu044cu043du044bu0445 large and medium diameter pipes from the bars and metal alloys based on titanium in u0442u0440u0443u0431u043eu043fu0440u043eu043au0430u0442u043du044bu0445 plants with u043fu0438u043bu0438u0433u0440u0438u043cu043eu0432u044bu043cu0438 mill s, including the casting of ingots in vacuum u0434u0443u0433u043eu0432u044bu0445 furnaces with subsequent hammering them in logging, drilling central u043eu0442u0432u0435u0440u0441u0442u0438u00a0 1005,0 diameter mmheating of ingots and billets in the furnace to the temperature u043cu0443u0444u0435u043bu00a0u0445 in teaching of 1155 - 1180u0441, firmware in the casings in a "rolling and u043fu0440u043eu043au0430u0442u043au0443 u043fu0435u0440u0435u0434u0435u043bu044cu043du044bu0445 u043fu0438u043bu0438u0433u0440u0438u043cu043eu0432u044bu0445 pipes ", u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, u043fu0440u043eu043au0430u0442u043au0443 pipes u043fu0438u043bu0438u0433u0440u0438u043cu043eu0432u043eu043c mill in u0443u0441u0442u0430u043du043eu0432u0438u0432u0448u0435u043cu0441u00a0 process u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 the casings in a deformation m = 20 - 40 mm and u0432u044bu0442u00a0u0436u043au043eu0439 = 2.5 to 4.0.;2. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that it can u0432u0440u0435u043cu00a0 value of increase from 10 to 20 mm, with u0443u0441u0442u0430u043du043eu0432u0438u0432u0448u0435u043cu0441u00a0 rolling process to gradually increase from 20 to 40 mm, and at a temperature less than 850u0441 casings, pipes, flow smoothly reduced to 25 mm, brand u043fu0438u043bu0438u0433u0440u0438u043cu043eu0432u044bu0445 heads u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 with pitch of not more than 20 mm.;3. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the rolling process of the u043fu0438u043bu0438u0433u0438u043cu043eu0432u043eu043c u0443u0441u0442u0430u043du043eu0432u0438u0432u0448u0435u043cu0441u00a0) increase the amount of u0432u044bu0440u0430u0436u0435u043du0438 which u043eu043fu0440u0435u0434u0435u043bu00a0u044eu0442;m = mu0443u0441u0442 + (tu043du0430u0447 - tu043au0440u0435u0442),;and at the temperature of pipes and casings, 850u0441 file which reduce the amount of u0432u044bu0440u0430u0436u0435u043du0438 u043eu043fu0440u0435u0434u0435u043bu00a0u044eu0442;m1 = m - (tu043au0440u0435u0442 - tu043au043eu043d) k1;where mu0443u0441u0442 = 20 - the value of the u0443u0441u0442u0430u043du043eu0432u0438u0432u0448u0435u043cu0441u00a0 rolling process, after the free and full path roll an apparatus, mm;;tu043du0430u0447 = 1155 - 1180 - temperature casings at the start of rolling.;tu043au0440u0435u0442 = 850 - u043au0440u0438u0442u0438u0447u0435u0441u043au0430u00a0 temperature shell - tube, in which the smooth, reduce the value of casings - pipe in hearth deformation.;tu043au043eu043d - temperature end mill casing - pipe.;to = 0.06 - coefficient, taking into account the increase in the beginning of u0443u0441u0442u0430u043du043eu0432u0438u0432u0448u0435u0433u043eu0441u00a0 rolling process, while reducing the temperature in the shell - tube 1c, mm / s;;k1 = 0.09 - rate, a decrease of in the process of rolling, in reducing the temperature of the tubes at 1c below critical mm / s.;4. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that after the free casings in u043fu0438u043bu0438u0433u0440u0438u043cu043eu0432u043eu0433u043e rolls mill and before the end of the rolling mill, reduce the water supply to the rolls u043fu0438u043bu0438u0433u0440u0438u043cu043eu0432u043eu0433u043e in 2 - 3 times.;5. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the u043fu0440u043eu043au0430u0442u043au0443 pipes u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 two dornach u0440u0430u0437u043eu0433u0440u0435u0442u044bu0445 600 - 650u0441 by rolling 2 - 3 u043du0430u0441u0442u0440u043eu0435u0447u043du044bu0445 carbonaceous shells.;6. method for p.5, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, after rolling of tubes made of alloy based on titanium and cooled in air to remove the dorn u043fu0435u0440u0435u043au0430u0442u044bu0432u0430u043du0438u0438 sloping grille during 30 - 45 with the tub with grease, u0434u043eu0440u043du043eu043fu043eu0434u044au0435u043cu043du044bu043c mechanism dorn with bath with lubricant and in 5 - 10 years, turning in u0434u043eu0440u043du043eu043fu043eu0434u044cu0435u043cu043du043eu043c mechanism at 18020 and re immersed in a bath with the lubricant 5 - 10, cooled in the air.and then pass to the castle of bowling apparatus and u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 u043fu0440u043eu043au0430u0442u043au0443 next pipes.;7. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that after the rolling of the saw cut u043fu0438u043bu0438u0433u0440u0438u043cu043eu0432u0443u044e u0433u043eu0440u00a0u0447u0435u0439 cutting head, a tube pass, u0438u0441u043fu043eu043bu044cu0437u0443u00a0 rolling heating temperature. the car went u0434u043bu00a0 curvature.;8. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the pipe is u043au0440u0430u0442u044b after the car with the camber over 4.0 mm in length 3600 to 4000 mm, u043du0430u0433u0440u0435u0432u0430u044eu0442u0441u00a0 in chamber furnace to the temperature of 750 to 800u0441 and in u043du0430u0433u0440u0435u0442u043eu043c u0441u043eu0441u0442u043eu00a0u043du0438u0438 u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 tweaking it to u0448u0442u0435u043cu043fu0435u043bu044cu043du043eu043c press.;9. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 point 9, so that the editing of pipes u043au0440u0430u0442u043eu0432 u043fu0440u043eu0438u0437u0432u043eu0434u00a0u0442 by bending the pipes in the opposite direction to the arrow deformation exceeding 1.5 - 2.0 times where big u0437u043du0430u0447u0435u043du0438u00a0 u043eu0442u043du043eu0441u00a0u0442u0441u00a0 tubes - u043au0440u0430u0442u0430u043c more camber.
机译:1.使用 u0442 u0440 u0443 u0431中基于钛和钛合金的棒材和金属合金轧制 u043f u0435 u0440 u0435 u0434 u0435 u043b u044c u043d u044b u0445 u043e u043f u0440 u043e u043a u0430 u0442 u043d u044b u0445具有 u043f u0438 u043b u043b u0438 u0433 u0440 u0438 u043c u043c u043e u0432 u044b u043c u0438s的工厂,包括在真空 u0434 u0443 u0433 u043e u0432 u044b u0445熔炉中铸造铸锭,然后在测井中进行锤击,在中心 u043e u0442 u0432 u0432 u0435 u0440 u0441 u0442 u0442 u0438 u00a0在1155-1180 u0441的教学中,将直径1005,0毫米的加热炉中的铸锭和钢坯加热到温度 u043c u0443 u0444 u0435 u043b u00a0 u0445,将外壳中的固件放在“滚动和 u043f”中 u0440 u043e u043a u0430 u0442 u043a u0443 u043f u0435 u0440 u0435 u0434 u0435 u043b u043b u044c u043d u044b u0445 u043f u0438 u043b u0438 u0433 u0440 u043c u043e u0432 u044b u0445管道“, u043e u0442 u043b u0438 u0447 u043 0 u044e u0449 u0438 u0439 u0441 u00a0, u043f u0440 u043e u043a u0430 u0442 u043a u0443管道 u043f u0438 u043b u0438 u0433 u0440 u0438 u043c u043e u0432 u043e u043c在 u0443 u0441 u0442 u0430 u043d u043e u043e u0432 u0438 u0432 u0448 u0435 u043c u044c u0441 u00a0进程 u043f u0440 u043c u043e u0438 u0437 u0432 u0434 u00a0 u0442变形m = 20-40 mm的套管和 u0432 u044b u0442 u00a0 u0436 u043a u043e u0439 = 2.5至4.0。; 2。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此它可以将 u0432 u0440 u0435 u043c u00a0的值从10增大到20 mm ,随着 u0443 u0441 u0442 u0430 u043d u043e u0432 u0438 u0432 u0448 u0435 u043c u0441 u00a0的轧制过程逐渐从20 mm增加到40 mm,并且温度低于850 u0441套管,管道,流量平稳地减小到25毫米,品牌 u043f u0438 u043b u0438 u0433 u0440 u0438 u043c u043e u0432 u044b u0445头 u043f u0440 u04340 u043e u0433u间距不超过20毫米; 3。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便 u043f u0438 u043b u0438 u0433 u0438 u043c u043e u0432 u043e u043c u0443 u0441 u0442 u0430 u043d u043e u043e u0432 u0438 u0432 u0448 u0435 u043c u0441 u00a0)增加 u0432 u044b u0440 u0430 u0436的数量 u0435 u043d u0438其中 u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u044e u0442; m = m u0443 u0441 u0442 +(t u043d u0430 u0447-t u043a u0440 u0435 u0442);并且在管道和套管的温度下,使用850 u0441文件可减少 u0432 u044b u0440 u0430 u0436 u0435 u043d u0438 u043e u043f u0440 u0435 u0434 u0435 u043b u00a0 u044e u0442; m1 = m-(t u043a u0440 u0435 u0442-t u043a u043e u043d)k1;其中m u0443 u0441 u0442 = 20- u0443 u0441 u0442 u0430 u043d u043e u0432 u0438 u0432 u0448 u0435 u043c u0441 u00a0滚动过程的值,在自由和完整路径滚动设备后,mm ;; t u043d u0430 u0447 = 1155-1180-温度e轧制开始时的套管。; t u043a u0440 u0435 u0442 = 850- u043a u0440 u0438 u0442 u0438 u0447 u0435 u0441 u043a u0430 u00a0温度壳-管,其中光滑,降低套管的值-炉膛变形管。t u043a u043e u043d-温度立铣刀套管-管道; = 0.06-系数,考虑到 u0443 u0441开始时的增加 u0442 u0430 u043d u043e u0432 u0438 u0432 u0448 u0435 u0433 u043e u0441 u00a0轧制过程中,同时降低了壳体中的温度-管1c,mm / s ;; k1 = 0.09-速率,降低了轧制过程中的温度,使管子的温度在低于临界毫米1 /秒的温度下降低了1摄氏度; 4。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此在 u043f u0438 u043b u0438 u0433 u0440 u0438 u043c u043e u0432 u043e u0433 u043e在轧机结束前,减少对轧辊的供水 u043f u0438 u043b u0438 u0433 u0440 u0438 u043c u043c u043e u0432 u043e u0433 u043e 2-3次;; 5。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此 u043f u0440 u043e u043a u0430 u0442 u043a u0443管道 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u00a0 u0442两个dornach u0440 u0430 u0437 u043e u043e u0433 u0440 u0435 u0442 u044b u0445 600-650 u0441通过滚动2-3 u043d u0430 u0441 u0442 u0440 u043e u0435 u0447 u043d u044b u0445碳质壳。; 6。 p.5的方法,在轧制钛合金管并在空气中冷却以除去磨损后, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 u043f u0435 u0440 u0435 u043a u0430 u0442 u044b u0432 u0430 u043d u0438 u0438倾斜的格栅在30-45分钟内使用盛有油脂的浴缸, u0434 u043e u0440 u043d u043e u043f u043e u0434 u044a u0435 u043c u043d u044b u043c带有润滑剂浴的机械磨损时间为5-10年,在18020处将 u0434 u043e u0440 u043d u043e u043f u043e u0434 u044c u0435 u043c u043d u043d u043e u043c机构打开,然后将其重新浸入含润滑剂5-10的浴中,并在空气,然后到达保龄球馆的城堡和 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u00a0 u0442 u043f u0440 u043e u043a u0430 u0442 u0432 u043a u0443 。; 7。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便在锯切后滚动 u043f u0438 u043b u0438 u0433 u0440 u0438 u043c u043e u0432 u0443 u044e u0433 u043e u0440 u00a0 u0447 u0435 u0439切割头,管通过, u0438 u0441 u043f u043e u043e u043b u044c u0437 u0443 u0040轧制加热温度。汽车弯曲了。8。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此,将汽车弯成弧度后,汽车的管道是 u043a u0440 u0430 u0442 u044b长度为4.0毫米的3600至4000毫米, u043d u0430 u0433 u0440 u0435 u0432 u0430 u044e u0442 u0441 u0040的温度为750至800 u0441和 u043d u0430 u0433 u0440 u0435 u0442 u043e u043c u0441 u043e u0441 u0442 u043e u00a0 u043d u0438 u0438 u043f u0440 u043e u0438 u0437 u0432 u043e u043e u0434 u00a0将其按到 u0448 u0442 u0435 u043c u043f u0435 u043b u044c u043d u043e u043c中; 9。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0点9的方法,以便对管道 u043a u0440 u0430 u0442 u0432 u043e u0432 u043f u0440 u043e u0438 u0437 u0432 u043e u0434 u00a0 u0442,方法是沿与箭头变形相反的方向弯曲管道,弯曲程度超过1.5-2.0倍,其中大的 u0437 u043d u0430 u0447 u0435 u043d u043d u00a0 u043e u0442 u043d u043e u0441 u00a0 u0442 u0441 u00a0电子管- u043a u0440 u0430 u0442 u0430 u043c的弯曲度更高。

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号