As shop drawing less design manner and the design figure of the production mannered
As shop drawing less design manner and the design figure of the production mannered
展开▼
机译:由于车间图纸设计方式少,生产的设计图简洁
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a construction drawing-less design method capable of further increasing efficiency, increasing quality, shortening construction period, and streamlining a building production method through the design and overall construction of a building by enabling the construction with construction drawings prepared by a design department and eliminating the need of preparing conventional construction drawings prepared by a construction department.;SOLUTION: A construction compatibility study step is executed. In the step, the design drawings of the building are prepared and construction conditions necessary for defining in detail the contents of the design of the building are taken in a standard template related to standard constructed objects stored in databases DB1 and DB2 beforehand. The detail study including the problems on the construction of the building is made, and individual templates related to the constructed objects installed on the frame of the building are prepared. By using the standard templates and/or the individual templates applied to the building, the execution drawings matching the building and having high degrees of definitions are prepared.;COPYRIGHT: (C)2004,JPO
展开▼