MEASURE SELECTION PROGRAM, MEASURE SELECTION APPARATUS, AND MEASURE SELECTION METHOD
展开▼
机译:度量选择程序,度量选择装置和度量选择方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A combination of measures are selected to set a recovery time of a business to be equal to or shorter than a time objective when a predetermined event occurs. A dependency relationship is shown between an operation constituting the business and resources necessary to continue the operation. Scenario information holds the recovery time required for a recovery when the predetermined event occurs for each of the resources. Measure information holds measures for reducing the recovery time and effects of the respective measures for each of the resources. Paths connecting a highest node to a terminal node of the resources included in the operation element related information are extracted according to the dependency relationship; and the combination of measures are selected so that a recovery time sum of the respective resources is equal to or shorter than the time objective on all the paths extracted by the resource path extraction procedure.
展开▼