首页> 外国专利> method and device for operation of a multiple components of comprehensive technical plant, especially a plant for generating electrical energy

method and device for operation of a multiple components of comprehensive technical plant, especially a plant for generating electrical energy

机译:综合工厂,尤其是发电工厂的多个部件的操作方法和装置

摘要

The method of operating a furnace for an electric power station involves free running of each component (1-8) and giving each component a value number (WZ1-3). The values of the individual components are summed. From the summed values, the connection or disconnection of each component is determined. An Independent claim is also included for a control circuit for carrying out the method.
机译:操作用于发电站的炉子的方法包括自由运行每个组件(1-8),并给每个组件一个值编号(WZ1-3)。将各个组件的值相加。根据总和值,确定每个组件的连接或断开。还包括用于执行该方法的控制电路的独立权利要求。

著录项

  • 公开/公告号DE50113205D1

    专利类型

  • 公开/公告日2007-12-13

    原文格式PDF

  • 申请/专利权人 SIEMENS AG;

    申请/专利号DE20015013205T

  • 发明设计人 SCHLICKER STEFAN;SCHREIBER ROLAND;

    申请日2001-12-12

  • 分类号F23N1;F23N5/24;

  • 国家 DE

  • 入库时间 2022-08-21 19:48:51

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号