首页> 外国专利> REINFORCEMENT ASSEMBLING METHOD FOR HIGH-RISE STRUCTURE REINFORCING METHOD, AND REINFORCEMENT ASSEMBLING JIG FOR THE SAME

REINFORCEMENT ASSEMBLING METHOD FOR HIGH-RISE STRUCTURE REINFORCING METHOD, AND REINFORCEMENT ASSEMBLING JIG FOR THE SAME

机译:高层结构加固方法的加固组装方法和相同的加固组装夹具

摘要

PROBLEM TO BE SOLVED: To provide a reinforcement assembling method which is applicable to the case of reinforcing a high-rise structure by using an elevating scaffold, and contributes to continuous arrangement of axial reinforcements and hoops without using a large crane, to thereby bring about drastic shortening of a construction period.;SOLUTION: The reinforcement assembling method is provided for carrying in and assembling reinforcement materials to the high-rise structure 1 by using the elevating scaffold 3. According to the method, hoists 5 are set on an upper portion of the high-rise structure 1, and jigs 20 for holding the plurality of reinforcements are loaded on the elevating scaffold 3, followed by hoisting the jigs 20 holding the reinforcements 12 from the elevating scaffold 3 by the hoists 5, to thereby assemble the reinforcements 12 held by the jigs 20 to the high-rise structure 1. Then intervals between the reinforcements 12 are adjusted by the jigs 20. Specifically the axial reinforcements 12 are vertically held at horizontal intervals by the jigs 20.;COPYRIGHT: (C)2009,JPO&INPIT
机译:解决的问题:提供一种增强组装方法,该方法适用于通过使用升降棚架来增强高层结构的情况,并且有助于在不使用大型起重机的情况下连续布置轴向增强件和箍,从而实现解决方案:提供了一种用于通过使用脚手架3将增强材料运入并组装到高层结构1中的增强件组装方法。根据该方法,将提升机5设置在上部。在高层结构1中,将用于保持多个加强件的夹具20装载到升降支架3上,然后通过升降机5将保持加强件12的夹具20从升降支架3上吊起,从而组装增强件由夹具20将夹具12保持在高层结构1上。然后,通过夹具20调节加强件12之间的间隔。夹具20将水平钢筋垂直固定在水平间隔上;版权所有:(C)2009,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号