首页> 外国专利> To lay out carriage rail type rate in carriage rail rail batter measure construction method of the possession roadbed raceway and

To lay out carriage rail type rate in carriage rail rail batter measure construction method of the possession roadbed raceway and

机译:在拥有路基滚道的车轨面糊量测施工方法中布置车轨率。

摘要

PROBLEM TO BE SOLVED: To provide a construction method for measures against the depression of a rail joint of a ballasted track, which can take gradual restoration measures against the depression of a rail by equipping a rail joint part with a gradual restoration means, which can reduce maintenance work, which can keep a lid on cost required for the maintenance work and which can improve riding comfort, and a pad structure of the rail joint part.;SOLUTION: In this construction method for the measures against the depression of a rail joint of the ballasted track, a resin-filled bag 4 and a sleeper mat 5 are laid on the undersurface of a sleeper 3A of the rail joint part; sleeper mats 10 are laid on the undersurface of front and rear sleepers 3B adjacent to the sleeper 3A of the rail joint part; a resin-filled bag 11 is laid between top surfaces of the front and rear sleepers 3B and an undersurface a rail tie plate 6; and the riding comfort is improved by taking the gradual restoration measures against the depression of the rail joint part by the action of gradually restoring the depression of the rail joint part and the rails in the front and rear of the rail joint part to an original state.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:要解决的问题:提供一种用于防止压载轨道的轨道接头凹陷的措施的施工方法,该方法可以通过为轨道接头部件配备逐步修复装置来采取逐步修复措施来防止轨道凹陷。减少维护工作,从而可以减少维护工作所需的成本并提高乘坐舒适性,并减少铁路接头部分的垫结构。在道track轨道中,在轨道结合部的轨枕3A的下表面放置树脂填充袋4和轨枕垫5。在与铁路接头部的轨枕3A相邻的前后轨枕3B的底面上铺设有轨枕垫10。在前,后枕木3B的上表面与下侧的铁路系接板6之间夹有树脂填充袋11。通过逐渐恢复轨道接头部分和轨道接头部分前后的凹陷的作用,采取渐进的恢复措施来克服轨道接头部分的凹陷,从而提高乘坐舒适性。 。;版权:(C)2006,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号