首页> 外国专利> Method for calculating a materials requirements plan for demands containing multiple demand dates and priorities

Method for calculating a materials requirements plan for demands containing multiple demand dates and priorities

机译:为包含多个需求日期和优先级的需求计算物料需求计划的方法

摘要

The methodology disclosed herein calculates the dates that product must come to stock for every component in the supply chain as needed to meet exit demands associated with a plurality of due dates and priorities. Every planned product stock is thus associated with multiple stock dates and associated priorities as is every planned manufacturing start and every shipment.
机译:本文所公开的方法根据需要计算产品必须在供应链中的每个组件上入库的日期,以满足与多个到期日和优先级相关的退出需求。因此,每个计划的产品库存都与多个库存日期和相关的优先级相关联,就像每个计划的制造开始和每次装运一样。

著录项

  • 公开/公告号US7613536B2

    专利类型

  • 公开/公告日2009-11-03

    原文格式PDF

  • 申请/专利权人 ROBERT A. ORZELL;

    申请/专利号US20060278818

  • 发明设计人 ROBERT A. ORZELL;

    申请日2006-04-06

  • 分类号G06F19/00;G06Q10/00;

  • 国家 US

  • 入库时间 2022-08-21 19:30:52

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号