首页>
外国专利>
METHOD FOR CALCULATING MATERIAL REQUIREMENT PLAN FOR DEMAND INCLUDING A PLURALITY OF DEMAND DATES AND PRIORITY
METHOD FOR CALCULATING MATERIAL REQUIREMENT PLAN FOR DEMAND INCLUDING A PLURALITY OF DEMAND DATES AND PRIORITY
展开▼
机译:包括多个需求日期和优先级的需求计算物料需求计划的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To solve a problem about a formation method of a material requirement plan when priority associated with needs varies as a function showing when the needs are satisfied.;SOLUTION: By the disclosed method, a date on which products must be stocked is calculated as to all the components in a supply chain required for satisfying an outlet demand associated with a plurality of time limits and the priority. All the planned product stocks are thus associated with a plurality of stock dates and the relationship priority similarly to all the planned manufacturing starts and all the shipments.;COPYRIGHT: (C)2008,JPO&INPIT
展开▼