首页> 外国专利> Automated management of development project files over a network

Automated management of development project files over a network

机译:通过网络自动管理开发项目文件

摘要

A technique is provided for managing a project schedule for a development project based on the aggregation of individual task schedules, where the individual task schedules are updated based on inspection results from two or more inspectors specified to inspect a project task product. The schedules, and consequently the updates thereof, are governed by a policy specifying that a task cannot be partially completed. The inspection results are linked to the individual task schedules, which are linked to the associated project schedule. Another technique is provided for managing project files over a network. Acceptance of a project proposal triggers the creation of individual sites for each individual specified to contribute to the project, where individual task schedules and draft project files can be linked to the individual site. The individual sites are linked to a project site and associated file directories are created and also linked to the project site.
机译:提供了一种用于基于各个任务时间表的聚集来管理开发项目的项目时间表的技术,其中,基于来自指定用于检查项目任务产品的两个或多个检查员的检查结果来更新各个任务时间表。日程安排以及因此的更新由指定无法部分完成任务的策略控制。检查结果链接到各个任务计划,这些任务计划也链接到相关的项目计划。提供了另一种用于通过网络管理项目文件的技术。接受项目建议会触发为指定要为项目做出贡献的每个人创建单个站点,在该站点中,可以将单个任务计划和项目草稿链接到单个站点。各个站点都链接到项目站点,并且创建了关联的文件目录,并且还链接到了项目站点。

著录项

  • 公开/公告号US7536313B2

    专利类型

  • 公开/公告日2009-05-19

    原文格式PDF

  • 申请/专利权人 TETSURO MOTOYAMA;

    申请/专利号US20070649450

  • 发明设计人 TETSURO MOTOYAMA;

    申请日2007-01-03

  • 分类号G06F17/50;

  • 国家 US

  • 入库时间 2022-08-21 19:30:06

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号