首页> 外国专利> METHOD FOR ERECTION OF BERTHING STRUCTURES AT WEAK SOILS

METHOD FOR ERECTION OF BERTHING STRUCTURES AT WEAK SOILS

机译:在弱土上架设停泊结构的方法

摘要

A method for erection of berthing structures on weak soils by which mounting base of the berthing structure is formed of multisection reinforced-concrete shells piles that are placed in rows in cross and long directions thereof and are deepened to the layer of compact grounds with increasing number of sections. After shell pile exceeds design height one arranges in its lower part a cement joggle. A top of the berthing structure is fixed to the base of the berthing structure with formation of a rear wall and underberthing slope. To decrease terms and to decrease material consumption at building, multisection shells piles are deepened to the bottom of water area up to the layer of compact grounds by washing out earth masses from inner cavity of each multisection shell pile through the hollow base of the lower section with water jet. The jet is formed by means of metal pipe with nozzle at the end placed to the inner cavity through which outside water is delivered under pressure with pump. The own weight of the shell pile and artificial mechanical load is used as additional vertical pressure.
机译:一种在弱土上架设靠泊结构的方法,其特征在于,靠泊结构的安装基础是由多段钢筋混凝土壳桩形成的,该桩沿其横向和纵向排列,并加深到层数越来越大的密实地面部分。壳桩超过设计高度后,在其下部布置一水泥泥浆。靠泊结构的顶部通过形成后壁和下靠坡而固定在靠泊结构的底部。为了减少工期并减少建筑物的材料消耗,通过从下半部分的空心底部冲洗掉每个多部分壳桩的内部空腔中的土体,将多部分壳桩加深到水区域的底部,直到致密地面为止与水射流。射流是通过金属管形成的,该金属管的末端有喷嘴,该喷嘴位于内腔中,在压力作用下,外部水通过该喷嘴输送。贝壳桩的自重和人造机械载荷被用作附加的垂直压力。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号