首页> 外国专利> METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS

METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS

机译:弱土封闭法竖井地下结构沉降的修正方法。

摘要

FIELD: construction.;SUBSTANCE: invention relates to construction and construction of buried structures, for example, tunnels and subway stations. Method of correction of subsidence trough at erection of underground structure by closed method in weak soils includes drilling of wells and initial creation of pre-fixed stabilizing layers of rock massif between foundation of building and area of arrangement of underground structure erected with the help of underground tunneling, with formation of alternating fixed stabilizing layers and loose extensible layers of rock mass. Further, the hardening solution is injected into loose expandable layers of the rock mass, located between the foundation of the building, fixed with stabilizing layers and erected underground structure, which is carried out during erection of the underground structure, taking into account the development of subsidence trough. In unfilled expanded layers of rock mass before construction of underground structure sensors are installed to measure parameters of stresses and deformations in rock mass, for this purpose additional wells are drilled for installation of sensors. Parameters are measured prior to driving an underground mine by erection of an underground structure and when they are changed during underground drilling, a hardening solution is injected into these layers until the values of stress and strain parameters in the rock massif between the foundation of the building and area of underground structure location, determined before underground tunneling.;EFFECT: technical result consists in improvement of accuracy of time of beginning and completion of works on injection of hardening solution and reduction of volumes of consumed materials for elimination of deformation of soil under foundations of buildings and structures at underground driving during construction, for example, tunnel of underground.;1 cl, 2 dwg
机译:埋入式结构的构造和建造技术领域本发明涉及埋入式结构的构造和建造,例如隧道和地铁站。在弱土中采用封闭法在地下结构安装过程中校正沉陷槽的方法包括钻井和在建筑物的基础与地下结构的布置区域之间建立岩体的预先稳定的稳定层的初始创建隧道,形成交替的固定稳定层和松散的岩体可扩展层。此外,考虑到地下建筑的发展,将硬化溶液注入到位于建筑物地基之间,用稳定层固定并竖立的地下结构的松散的可膨胀岩层中,这是在地下结构的安装过程中进行的。沉降槽。在建造地下结构之前,在未填充的岩体扩展层中安装传感器以测量岩体中的应力和变形参数,为此,需要钻更多的井来安装传感器。在安装地下结构之前,在驱动地下矿井之前对参数进行测量,并且在地下钻井过程中更改参数时,将硬化溶液注入这些层中,直到建筑物基础之间的岩体中的应力和应变参数值效果:技术成果包括提高注入硬化溶液的工程的开始和完成时间的准确性以及减少用于消除地基下土体变形的消耗的材料量的技术结果施工期间地下驱动时建筑物和结构的数量,例如地下隧道。; 1 cl,2 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号