首页>
外国专利>
CONSRTRUCTION METHOD OF SEPARATION STAND STRUCTURE FOR HIGHWAY
CONSRTRUCTION METHOD OF SEPARATION STAND STRUCTURE FOR HIGHWAY
展开▼
机译:高速公路隔离桩结构的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A construction method of a highway median strip structure is provided to reduce the construction period and personnel cost by reusing an H-steel pile after construction. A construction method of a highway median strip structure is composed of steps of: forming an H-steel pile(20) at the end of a high pressure injection nozzle; installing the H-steel pile to the predetermined depth of the rock layer(S100); pulling off the H-steel pile; consecutively filling soil mixed mortar(30) from the rock layer to the soft ground layer by using a rubber hose(S200); laying a fixing unit(50) in the upper part of the installation space; and installing a median strip fence(40) in the fixing unit(S300).
展开▼