首页> 外国专利> GUIDEWAY WAY CONSTRUCTION METHOD OF AUTOMATED GUIDEWAY TRANSIT TYPE LIGHT WEIGHT RAILWAY AND THEREOF CONSTRUCTION MACHINE

GUIDEWAY WAY CONSTRUCTION METHOD OF AUTOMATED GUIDEWAY TRANSIT TYPE LIGHT WEIGHT RAILWAY AND THEREOF CONSTRUCTION MACHINE

机译:自动导轨式轻型铁路的导轨施工方法及其施工机

摘要

A guide rail construction method of automated guide rail transit type light weight railway and a construction machine for the same are provided to reduce construction cost and time by mounting a guide rail in the insertion part of a guide plate and coupling a fixation plate and the guide rail. A guide rail construction method of automated guide rail transit type light weight railway comprises following steps. The central line of a roadbed is measured. The rotary shaft of a guide plate is positioned at the intersection point of the roadbed central line and the upper side of the railway rail. The angle of the guide plate is controlled by measuring the locus of the guide rail based on the rotary shaft. A hole for fixing an anchor bolt is punched at a vertical wall according to the angle of a guide plate. The anchor bolt is fixed to the hole. A fixation plate is fixed on the anchor bolt. The guide rail fitting for the section is mounted on the insertion part of the guide plate. The fixation plate and the guide rail are coupled.
机译:提供一种通过将自动轨道安装在导向板的插入部上并连结固定板和导向装置来减少施工成本和时间的自动导向轨道轻型铁路的导向装置的施工方法和工程机械。轨。自动导轨运输型轻轨铁路的导轨施工方法包括以下步骤。测量路基的中心线。导向板的旋转轴位于路基中心线与铁路轨道的上侧的交点处。通过基于旋转轴测量导轨的轨迹来控制导向板的角度。根据导向板的角度在垂直壁上打一个用于固定地脚螺栓的孔。地脚螺栓固定在孔上。固定板固定在地脚螺栓上。用于该区段的导轨配件安装在导向板的插入部分上。固定板和导轨连接。

著录项

  • 公开/公告号KR100910912B1

    专利类型

  • 公开/公告日2009-08-05

    原文格式PDF

  • 申请/专利权人 KANG NAM HUN;

    申请/专利号KR20090003773

  • 发明设计人 KANG NAM HUN;

    申请日2009-01-16

  • 分类号E01B25/28;E01B5/18;E01B2;

  • 国家 KR

  • 入库时间 2022-08-21 19:11:44

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号