首页> 外国专利> Producing and mounting nickel alloy-based superheater tube coils, for steam generators, includes forming and hardening tubes in workshop before mounting and hardening weld seams on site

Producing and mounting nickel alloy-based superheater tube coils, for steam generators, includes forming and hardening tubes in workshop before mounting and hardening weld seams on site

机译:生产和安装用于蒸汽发生器的镍基过热器线圈,包括在现场安装和硬化焊缝之前在车间形成和硬化管。

摘要

Superheater tube coils (1) of deposition-hardened, solution-annealed nickel-based alloy, plus sheathed connecting tubes (4), are formed and mounted in a steam generator tube wall (6) by (a) forming coils and joining sheaths with connecting pipes by welding, (b) hardening, (c) joining coils and connecting pipes in the wall, and sheaths with receivers in the wall, by welding and (d) hardening the seams. Steps (a) and (b) are carried out in a workshop, and (c) and (d) at the mounting site. Production of superheater tube coils (1) (formed from straight tubes (2) and bends (3)) and their connecting tubes (4) (formed with exterior sheaths (5)), and mounting of the coils in a steam generator tube wall (6), involves: (A) providing straight, bend precursor and connecting tubes of deposition-hardened nickel-based alloy in solution-annealed form, and sheaths of material not to be heat-treated, in a workshop; (B) forming the bends and connecting tubes in a workshop, using bending tools; (C) forming the individual coils by joining the straight tubes and bends, and joining the sheaths with the connecting tubes in the region (8) where the pipes pass through the tube wall, using weld seams (9) formed in a workshop; (D) deposition-hardening the coils and sheathed connecting tubes in a first heater in a workshop; (E) joining the coils with the connecting pipes within the tube wall, and the sheaths with preformed receivers (of material not to be heat-treated) within the tube wall, using weld seams (11) formed at the mounting site; and (F) deposition hardening these seams using local second heaters at the mounting site.
机译:沉积硬化,固溶退火的镍基合金的过热器管线圈(1)加上护套连接管(4)形成并安装在蒸汽发生器管壁(6)中,方法是(a)形成线圈并将护套与通过焊接连接管道,(b)硬化,(c)将线圈和连接管连接在墙壁上,将带有护套的护套连接到墙壁,通过焊接和(d)加固接缝。步骤(a)和(b)在车间进行,而步骤(c)和(d)在安装地点进行。生产过热管盘管(1)(由直管(2)和弯头(3)形成)及其连接管(4)(由外护套(5)形成),并将盘管安装在蒸汽发生器管壁上(6)包括:(A)在车间内提供笔直的,弯曲的前体和固溶退火形式的沉积硬化镍基合金的连接管,以及不需热处理的材料的护套; (B)使用弯曲工具在车间内形成弯曲和连接管; (C)使用车间内形成的焊缝(9),通过将直管和弯头连接起来,并在管子穿过管壁的区域(8)中将护套与连接管连接起来,形成单个线圈; (D)在车间的第一加热器中使线圈和带护套的连接管沉积硬化。 (E)使用在安装地点形成的焊缝(11)将线圈与管壁内的连接管连接在一起,并将鞘管与管壁内的预制接收器(未经热处理的材料)连接起来; (F)在安装位置使用局部第二加热器沉积硬化这些接缝。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号