首页> 外国专利> A method for determining the intermediate states by means of the inclined cable bridges construction ursprüngliher dimensions of the components units

A method for determining the intermediate states by means of the inclined cable bridges construction ursprüngliher dimensions of the components units

机译:一种通过倾斜的电缆桥架确定中间状态的方法

摘要

A process for the determination of the intermediate states of the obliquely cable bridges construction by means of its original dimensions of the components units, which in the calculation method of the assembly of the cable-stayed bridge is divided. More precisely, they are a method in which the intermediate states of the obliquely cable bridges construction by means of its original dimensions of the components units are determined, wherein the method comprising the steps of: 1) calculation of the original dimensions of the components of units of the cable bridge in the final state of the cable bridge; 2) for carrying out the assembly calculations. In this case, the original dimensions of the components units with their original dimensions in the final condition of the cable bridge brought into correspondence with each other; 3) when the voltage exceeds a limit value, are the forces between clamping to adjust the cable stays. An adjustment of all the cables according to the termination of the assembly is to be carried out, by the influence of the contraction according to eliminate flexibility of the concrete; 4) new calculation of the original dimensions of the components of units of the cable bridge, in that the influences of structural forces on the inside of the dimensions of the components units of the cable-stayed bridge be drawn off in step 3; and 5) repeating the steps 2, 3 and 4 with the in step 5 calculated original dimensions of the components of units of the cable bridge, to the states of the in step 4 ..
机译:借助于斜拉桥构件的原始尺寸来确定斜拉桥结构的中间状态的过程,在斜拉桥的装配的计算方法中将其划分。更准确地说,它们是一种方法,其中通过其斜角桥构件的原始尺寸确定了斜拉桥结构的中间状态,其中该方法包括以下步骤:1)计算构件的原始尺寸。处于最终状态的电缆桥架单元; 2)进行装配计算。在这种情况下,使组件单元的原始尺寸与电缆桥架最终状态下的原始尺寸相互对应; 3)当电压超过极限值时,在夹紧力之间调整电缆的拉力。根据收缩的影响,应根据收缩的影响对所有电缆进行调整,以消除混凝土的柔韧性; 4)重新计算电缆桥架的单元的原始尺寸,其中在步骤3中提取结构力对斜拉桥单元的单元尺寸内部的影响;和5)重复步骤2、3和4,将步骤5中计算出的电缆桥架各单元的原始尺寸转换为步骤4中的状态。

著录项

  • 公开/公告号DE102009010865A1

    专利类型

  • 公开/公告日2009-09-24

    原文格式PDF

  • 申请/专利权人

    申请/专利号DE20091010865

  • 发明设计人

    申请日2009-02-27

  • 分类号E01D21/00;

  • 国家 DE

  • 入库时间 2022-08-21 19:08:59

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号