首页> 外国专利> Improving production by actual loss allocation

Improving production by actual loss allocation

机译:通过实际损失分配提高产量

摘要

A method for allocating actual production loss of a wellsite. The method includes defining a data collection procedure and capturing production data according to the data collection procedure, the production data including actual production data and a maximum production potential of the wellsite. The method further includes selectively allocating a portion of the actual production data to the wellsite based on allocation rules to obtain derived production data, comparing the derived production data to the maximum production potential to determine the actual production loss for the wellsite, allocating the actual production loss to at least one of the production events, and determining a cause of the actual production loss based on an engineering analysis of the production events.
机译:一种分配井场实际生产损失的方法。该方法包括定义数据收集程序并根据该数据收集程序捕获生产数据,该生产数据包括实际生产数据和井场的最大生产潜力。该方法还包括基于分配规则有选择地将一部分实际生产数据分配到井场以获得衍生的生产数据,将衍生的生产数据与最大生产潜力进行比较以确定井场的实际生产损失,分配实际产量损失至少一个生产事件,并基于对生产事件的工程分析确定实际生产损失的原因。

著录项

  • 公开/公告号GB0823017D0

    专利类型

  • 公开/公告日2009-01-28

    原文格式PDF

  • 申请/专利权人 LOGINED B.V;

    申请/专利号GB20080023017

  • 发明设计人

    申请日2008-12-18

  • 分类号E21B41/00;

  • 国家 GB

  • 入库时间 2022-08-21 19:07:05

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号