首页>
外国专利>
SELF-PROPELLED CONSTRUCTION MACHINERY FOR SLOPE FINISHING COMPACTION METHOD, AND SLOPE FINISHING COMPACTION METHOD USING THE SAME
SELF-PROPELLED CONSTRUCTION MACHINERY FOR SLOPE FINISHING COMPACTION METHOD, AND SLOPE FINISHING COMPACTION METHOD USING THE SAME
展开▼
机译:边坡压实法自推进施工机械及采用相同方法的边坡压实法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide self-propelled construction machinery for a slope finishing compaction method, and the slope finishing compaction method using the same, which can completely prevent a filling material from dropping downward out of a slope.;SOLUTION: This self-propelled construction machinery 10 for practicing the slope finishing compaction method for filling work in a trapezoidal CSG dam etc. includes: a top-of-slope molding form 1 which is composed of a fixed form 2 having a sectional shape corresponding to the slope 6 of a bank-like embankment body 15 formed on the top of the slope and a levee crown surface 7, and a movable form 3 arranged in the state of facing the fixed form 2 and advancing to/receding from the side of the fixed form 2 by a driving means 4; and a compacting machine 5 which is mounted on the top-of-slope molding form 1. The fixed form 2 is arranged in such a manner as to correspond to the slope of the bank-like embankment body 15 formed on the top of the slope, and the levee crown surface. The movable form 3 bites into the filling material 8 so as to be moved toward the side of the fixed form 2 by the driving means 4. Thus, the filling material 8 is drawn nearer to the side of the fixed form 2, and the bank-like dam body 15 is formed on the top of the slope by performing compaction by means of the compacting machine 5.;COPYRIGHT: (C)2010,JPO&INPIT
展开▼