A method to automate look-ahead schedule (LAS) generation for the finishing phase of construction projects

机译:一种在建筑项目的完成阶段自动执行提前计划(LAS)的方法

获取原文
获取原文并翻译 | 示例
       

摘要

Look-ahead schedules (LASs) in the finishing phase of complex projects produced with sufficient detail can help prevent conflict, ensure correct work sequence, and facilitate a fluent workflow for a crew, preventing rework. Unfortunately, such LASs are rarely used in these projects because of the time-consuming schedule generation process, the high probability of introducing errors into the LASs and the inability to find the close-to-optimum LAS from the vast number of feasible alternatives. This paper proposes an automated LAS generation (ALASG) method addressing these challenges. A software prototype developed based on the ALASG method is presented and a simulation-based approach is introduced to find close-to-optimum LASs quickly in terms of construction duration or cost for a case study. The proposed method contributes to the field of automated project scheduling, particularly automated look-ahead scheduling, through the quick generation of error-free, close-to-optimum LASs for the finishing phase of complex projects.
机译:在具有足够详细信息的复杂项目的完成阶段中,提前完成时间表(LAS)可以帮助防止冲突,确保正确的工作顺序,并使工作人员的工作流程流畅,防止返工。不幸的是,由于耗时的进度表生成过程,将错误引入LAS的可能性很高以及无法从大量可行的替代方案中找到最接近的LAS,此类LAS在这些项目中很少使用。本文提出了一种自动LAS生成(ALASG)方法来应对这些挑战。提出了一种基于ALASG方法开发的软件原型,并引入了基于仿真的方法,以根据案例的工期或成本快速找到接近最佳的LAS。通过为复杂项目的完成阶段快速生成无错误,接近最佳的LAS,所提出的方法有助于自动化项目调度领域,特别是自动化的超前调度领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号