首页> 外国专利> Tapping dregs amount control method of blast furnace

Tapping dregs amount control method of blast furnace

机译:高炉出渣量控制方法

摘要

PROBLEM TO BE SOLVED: To extend the iron tapping time by stabilizing the balance of tapping iron slag and reducing the number of the iron tappings. ;SOLUTION: When an iron tapping hole 7 is plugged, mud pushing quantity pushed from the iron tapping hole 7 to a furnace hearth part is reduced, to enlarge the space between a mud piling layer 5 and a coke packing layer 4 and thus, the fluidity of the molten iron and slag 9 in this space is improved and the iron tapping slag quantity is increased. Oppositely, when the iron tapping slag quantity is reduced, the mud pushing quantity is increased to reduce the space between the mud piling layer 5 and the coke packing layer 4, and thus, the fluidity of the molten iron slag in this space is lowered.;COPYRIGHT: (C)2000,JPO
机译:解决的问题:通过稳定出铁渣的平衡并减少出铁次数来延长出铁时间。 ;解决方案:当堵住出铁孔7时,从出铁孔7推入炉床炉底部分的推泥量将减少,从而扩大了打泥层5和焦炭填充层4之间的空间,从而在该空间中,铁水和炉渣9的流动性得到改善,并且出铁渣量增加。相反,当减少出铁渣的量时,增加泥浆的量以减小泥浆堆积层5和焦炭堆积层4之间的空间,因此,铁水渣在该空间中的流动性降低。 ;版权:(C)2000,日本特许厅

著录项

  • 公开/公告号JP4397448B2

    专利类型

  • 公开/公告日2010-01-13

    原文格式PDF

  • 申请/专利权人 JFEスチール株式会社;

    申请/专利号JP19990058995

  • 发明设计人 大平 安義;

    申请日1999-03-05

  • 分类号C21B5/00;C21B7/12;

  • 国家 JP

  • 入库时间 2022-08-21 18:59:41

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号