首页>
外国专利>
Method for safe long term custody of solution-filled cavities through sub-layers with industrial waste and further use of the displaced solution in industrial processes
Method for safe long term custody of solution-filled cavities through sub-layers with industrial waste and further use of the displaced solution in industrial processes
展开▼
机译:通过工业废物通过子层安全地长期保管溶液填充型腔以及在工业过程中进一步使用置换后的溶液的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
Geomechanically, long-term-safe filling of solution-fulfilled cavern with waste based high consistency suspensions after recipe when simultaneous utilization of the displaced excess solution in the industrial processes, comprises introducing a fluid barrier containing a highly concentrated, aqueous heavy solution before bringing the high consistency suspensions, where the solution is a saturated solution against the aqueous rock of the cavern, with which the solution contents of the cavern is controlled, and processing the high consistency displacement components in the wet in wet-process.
展开▼