首页> 外国专利> WELL EFFICIENCY RECOVERY AND START UP OF STAND BY WELLS WITH COMPLICATED DESIGN COLLECTORS IN ALFP CONDITIONS AND PRODUCTION STRING BOTTOM PART COLLAPSE

WELL EFFICIENCY RECOVERY AND START UP OF STAND BY WELLS WITH COMPLICATED DESIGN COLLECTORS IN ALFP CONDITIONS AND PRODUCTION STRING BOTTOM PART COLLAPSE

机译:复杂的设计收集器在ALFP条件下井的效率恢复和井架启动以及生产底层底部的塌陷

摘要

FIELD: oil-and-gas industry.;SUBSTANCE: method of efficiency recovery and stand by wells, with collector of complicated design in abnormally low formation pressure conditions and production string bottom part collapse includes execution of repair-isolation works and reservoir opening. Sweep up the string, repair its compressed bottom, wash in a sand plug till depth of the nearest to a gas-water contact - GWC clay sub layer, descend in to the string a tail from casing pipes of a smaller diametre up to the sand plug head, with the tail head dislocation 20 m above of the reservoir roof, cement the tail with a cement slurry, leaving a cement barrel 1-2 m higher the tails shoe. After cement fixing - CFT drill the cement barrel, wash the sand plug up to the current GWC, through perforation holes with perforation interval 15-20 m3 of the water sealing composition, press it through 3-5 m3 of the cement slurry in to the reservoir, creating water sealing screen and stop over the defined height cement barrels sand plug. After the CFT execute perforation - hydro-sand-jetted or with powerful cumulative perforator - of the production string and the tail in interval over cement barrel head up to the reservoir roof and gas flow activation. The cement slurry contains portlandcement, superplastisiser C-3, polyvinyl alcohol, and polypropylene fiber.;EFFECT: well efficiency recovery and stand by wells operation start up reliability increase.;1 ex, 4 dwg
机译:领域:油气开采:方法:效率恢复和待命井的方法,在异常低的地层压力条件下,设计复杂的集热器,并且生产管柱的底部塌陷,包括进行维修隔离工作和开油藏。扫起细绳,修复其压缩的底部,用砂塞清洗,直到最接近气-水接触的深度-GWC粘土子层,从较小直径的套管向下到细绳的末端直到细砂塞头,尾头错位到储层顶板上方20 m处,用水泥浆将尾巴固结,使水泥桶的尾靴高出1-2 m。水泥固定后-用CFT钻水泥桶,通过打孔间隔为15-20 m 3 的水封组合物,将砂塞洗至当前的GWC,将其压入3-5将m 3 的水泥浆注入储层,形成水封网,并停止在定义高度的水泥桶砂塞处。在CFT实施射孔之后(射流喷砂或强力累积射孔器),对生产管柱和尾部在水泥桶顶部直至储层顶板和气流激活之间进行射孔。水泥浆包含波特兰水泥,超塑化剂C-3,聚乙烯醇和聚丙烯纤维。效果:提高井效率并支持备用井运行,启动可靠性提高; 1 ex,4 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号