首页> 外国专利> METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE

METHOD OF RECOVERY OF YIELD AND BRINGING TO OPERATION OF TEMPORARILY SHUT-IN WELLS WITH COMPLICATED STRUCTURE OF COLLECTORS UNDER CONDITIONS OF ABNORMALLY LOW BED PRESSURE

机译:在床压力异常低的情况下,采用复杂的集热器结构对临时关井进行采收率和采油率的恢复方法

摘要

FIELD: oil and gas production.;SUBSTANCE: method of recovery of yield and bringing to operation of temporarily shut-in wells with complicated structure of collectors under conditions of abnormally low bed pressure including repair, insulating, and exposure of producing bed consists in following: initially, sand plug is washed for depth 2-3 m below current gas-water contact (GWC); producing string is callipered, shank end out of casing tubes of smaller diametre is lowered into producing string up to head of washed sand plug; head of shank end is arranged 20 m above top of producing bed. The shank end is cemented with cement grout; upon waiting-on-cement completion (WCC) two columns, the producing column and the shank end are perforated in interval below the first over current GWC clay interlayer to depth 2-3 m below current GWC. Water insulating composition at volume 15-20 m3 is pumped through perforated openings made for water insulation; composition is forced through into depth of the producing bed creating a water insulating screen with cement grout of volume 3-5 m3; a cement sleeve 1-2 m above the first over the current GWC clay interlayer is left at the bottomhole. Upon WCC perforating is performed for operation of two columns, the producing column and the shank end in interval above the second over the current GWC clay interlayer up to the top of the producing bed; gas discharge is initiated. Composition containing Portland cement, super-plasticiser C-3, polyvinyl alcohol and polypropylene fibre is used as cement grout; while for perforation either a high-power cumulative perforator or hydraulic jet are used.;EFFECT: insulating fluid entry, ensuring pressure tightness of producing column and additional gas withdrawal from earlier shut-in wells.;1 ex, 4 dwg
机译:领域:油气生产;实质:在异常低床压的条件下,包括维修,隔离和暴露生产层的情况下,恢复具有复杂收集器结构的临时关闭井的产量并使其运转的方法,包括以下内容:首先,将砂塞冲洗到当前气-水接触面(GWC)以下2-3 m的深度;将生产管柱弄成圆锥形,将较小直径的套管中的杆端降低到生产管柱中,直至洗净的砂塞头。杆端头距生产床顶部20 m。杆端用水泥浆固结;水泥等待完井(WCC)后,在第一根过流GWC黏土夹层下方的间隔内,将生产柱和柄端打孔,直到当前GWC下方2-3 m的深度。将体积为15-20 m 3 的水绝缘组合物泵入用于水绝缘的穿孔开口中;迫使组合物进入生产床的深度,形成一个水绝缘筛网,水泥浆的体积为3-5 m 3 ;在当前GWC粘土夹层之上的第一个上方1-2 m处有一个水泥套管留在井底。在进行WCC射孔以操作两根塔之后,在当前的GWC粘土夹层上,直到生产床顶部为止,生产塔和钻杆在第二根以上的间隔结束。气体放电开始。水泥砂浆使用的成分为波特兰水泥,高效减水剂C-3,聚乙烯醇和聚丙烯纤维。效果:绝缘流体进入,确保生产塔的压力密封性,并从较早关闭的井中抽出额外的气体。1ex,4 dwg

著录项

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号