首页> 外国专利> Method for securing upper end of mine-duct filled with poriferous mass against breakage of ground, involves filling of reinforced and non-reinforced concrete in hollow drill that is pulled before concrete solidification

Method for securing upper end of mine-duct filled with poriferous mass against breakage of ground, involves filling of reinforced and non-reinforced concrete in hollow drill that is pulled before concrete solidification

机译:用于确保填充有多孔物质的矿井管道的上端防止地面破裂的方法,包括在混凝土凝固之前将空心和无筋混凝土填充到空心钻机中

摘要

The method involves removing soil from an upper end of a duct (1), where the soil encompasses poriferous mass. Concrete filling form stoppers that are held in the ground directly or indirectly. The removal of the poriferous mass and the soil, and filling of the concrete are carried out step by step by providing of supplement bored piles (5-8) at the cross section of the stoppers using a hollow drill and filling of reinforced and non-reinforced concrete in the drill, which is pulled out before solidification of the concrete.
机译:该方法包括从导管(1)的上端去除土壤,其中导管包含多孔物质。混凝土填充模板可直接或间接固定在地下。通过使用空心钻在塞子的横截面上提供补充钻孔的桩(5-8)并逐步填充钢筋和非钢筋,逐步除去多孔物质和土壤,并填充混凝土。钻头中的钢筋混凝土,在混凝土凝固之前将其拉出。

著录项

  • 公开/公告号DE102009008516A1

    专利类型

  • 公开/公告日2010-08-12

    原文格式PDF

  • 申请/专利权人 KRUECK JOCHEN;

    申请/专利号DE20091008516

  • 发明设计人 KRUECK JOCHEN;

    申请日2009-02-11

  • 分类号E21F1/16;E02D17/08;

  • 国家 DE

  • 入库时间 2022-08-21 18:28:24

相似文献

  • 专利
  • 外文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号