In the mortar to creation field of the dam stopping body and creation field
In the mortar to creation field of the dam stopping body and creation field
展开▼
机译:在砂浆到坝体止水体的创作领域及创作领域
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a carrying method capable of efficiently carrying mortar and concrete manufactured by batcher plants 21 and 22 arranged in a place of the height not less than a top part of a dam bank body in completion, at a preparation site of the dam bank body 1.;SOLUTION: The concrete is carried to the preparation site of the dam bank body 1 by a carrying facility such as a cable crane 4 in a state of being loaded in a bucket 3, and is inputted in a hopper 9 arranged at the preparation site. The concrete is loaded in a dump truck 10 from the hopper 9, and is carried to a concrete placing place of the preparation site. While, the mortar is carried to the preparation site of the dam bank body 1 via a pipeline 11. The mortar is loaded in a truck mixer 16 from the pipeline 11, and is carried to a mortar placing place of the preparation site.;COPYRIGHT: (C)2009,JPO&INPIT
展开▼