首页> 外国专利> Workforce management system for forecasting and scheduling work items that cross intervals

Workforce management system for forecasting and scheduling work items that cross intervals

机译:劳动力管理系统,用于预测和安排跨时间间隔的工作项目

摘要

A forecast and plan generation process for a workforce management (WFM) system implements an algorithm to calculate staffing requirements when average handling time (AHT) is longer than a data collection statistics period and/or a work item is in progress of being handled in more than one interval. A schedule generation process schedules an agent for intervals after a work item is provided/connected to the agent, preferably up to an including an interval when the work item terminates (based on the AHT of the work item and a simulated arrival time of the work item). Additional agents are scheduled for new work items that are forecasted to arrive in an interval, in addition to the agents that may already be connected to a contact.
机译:劳动力管理(WFM)系统的预测和计划生成过程实现了一种算法,以在平均处理时间(AHT)长于数据收集统计周期和/或正在处理更多内容的工作项时计算人员需求一个间隔以上。计划生成过程在将工作项提供/连接到代理后安排代理的时间间隔,最好直到工作项终止时的间隔(基于工作项的AHT和工作的模拟到达时间)项目)。除了可能已经连接到联系人的座席外,还计划为其他工作人员安排新的工作项,这些工作项预计将在一定间隔内到达。

著录项

  • 公开/公告号US2011145032A1

    专利类型

  • 公开/公告日2011-06-16

    原文格式PDF

  • 申请/专利权人 WILLIAM NATHAN STEARNS;

    申请/专利号US20090636804

  • 发明设计人 WILLIAM NATHAN STEARNS;

    申请日2009-12-14

  • 分类号G06Q10/00;

  • 国家 US

  • 入库时间 2022-08-21 18:15:08

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号