首页> 外国专利> Frequency based method for scheduling jobs with hard constraints

Frequency based method for scheduling jobs with hard constraints

机译:基于频率的硬约束作业调度方法

摘要

A method is provided for generating a feasible schedule for n jobs given a duration and a revisit time for each job. The method comprises determining whether it is impossible to generate a feasible schedule, determining whether a round robin schedule is possible, calculating theoretical probabilities, calculating actual probabilities, creating a potential schedule based on the theoretical probabilities and the actual probabilities, and searching for a feasible schedule from the potential schedule.
机译:提供了一种方法,该方法为给定的每个作业的持续时间和重新访问时间为n个作业生成可行的时间表。该方法包括:确定是否不可能生成可行的进度表;确定循环调度是否可能;计算理论概率;计算实际概率;基于理论概率和实际概率来创建潜在进度表;以及寻找可行的方法。从潜在的时间表。

著录项

  • 公开/公告号US7856369B2

    专利类型

  • 公开/公告日2010-12-21

    原文格式PDF

  • 申请/专利权人 EUGENE FEINBERG;MICHAEL CURRY;

    申请/专利号US20030613507

  • 发明设计人 EUGENE FEINBERG;MICHAEL CURRY;

    申请日2003-07-03

  • 分类号G06F17/50;

  • 国家 US

  • 入库时间 2022-08-21 18:08:23

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号